Home Remodeling Contractors in Quilcene, WA
Kitchens, bathrooms, additions and ADUs for Quilcene homes at the head of Quilcene Bay, planned around Jefferson County permits, the Big and Little Quilcene rivers, and the septic and water records the county asks for first.
- Plans and the Jefferson County application package are prepared by our team.
- A written, itemized price is agreed before anyone starts work.
- One project manager stays with your job from the first site visit to the last inspection.
By appointment. Limited start dates.
- Over 200 projects
- 4.9 on Google
- 20+ years building
- WA license VOLCABI792C6
Three Quilcene rules that shape a remodel
-
The Quilcene rule
Two rivers with mapped floodplains
The Little Quilcene River runs through the north end of Quilcene and the Big Quilcene reaches the bay just south of it. The county's 2023 flood hazard plan maps about 241 acres of 100 year floodplain along the lower Big Quilcene and about 130 acres along the Little Quilcene, most of it residential. Under JCC 15.15.080, a new house or a substantial improvement in those zones must put its lowest floor, basement included, and its mechanical equipment at least one foot above the base flood elevation. The code counts work as a substantial improvement once its cost reaches half the market value of the structure.
What we doBefore any design work, we check your address against the flood insurance rate maps Jefferson County has adopted.
-
The Quilcene rule
Flood permits and a habitat assessment
Jefferson County's critical areas ordinance, adopted on 9 March 2026, requires a separate flood permit application to the Department of Community Development for any development in a 100 year floodplain or floodway, even work that is otherwise exempt. When any part of a project lies in a FEMA special flood hazard area, the county also asks for a habitat assessment, because floodplain building in Puget Sound has to protect listed fish; threatened Hood Canal summer chum are among the salmon documented in both Quilcene rivers.
What we doWe file the flood permit application with the Department of Community Development together with your building permit.
-
The Quilcene rule
Septic and water before the building permit
Quilcene has no public sewer: the county's flood plan found that every property in its study area treats wastewater on site, mostly with septic systems, and that a single drainfield needs about 12,500 square feet of ground. Jefferson County will not take a building application until a septic application is on file and drinking water is proven: a signed availability notice from the PUD's Quilcene Water System for the homes it serves in the village, or well logs and a lab analysis for a private well.
What we doWe schedule the septic and water approvals ahead of the building permit and file the application once both are in hand.
All three are worked through during design, before the application goes to the county.
What homeowners say about working with us
Bar and the team at Volcano Builders did a great job! Professional service, great communication throughout the whole process, and everything was done with care and attention to detail. Highly recommend!
Bar's team completely transformed my outdated Seattle bathroom with their exceptional work. Their communication was excellent, keeping me informed every step of the way. The quality of their workmanship exceeded my expectations, turning my old bathroom into what I wanted. I highly recommend Bar and his team for any remodeling project; they're professional, efficient, and produce outstanding results.
Volcano Builders did a great job on our master bathroom. The tile work and finishing touches were great. Even though they weren't the cheapest quote we got, you can tell they care about quality.
Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.
I had an amazing experience with Volcano Builders! Bar was incredibly kind, communicative, and made the whole process smooth. We completely redid the bathroom,new flooring, vanity, tub, and wall tiles, and it turned out fantastic. I'm so happy with their work that I'm already planning my second bathroom and hopefully the kitchen too. Highly recommend them to anyone looking for quality work and great service!
Gad an amazing experience with Volcano Builders on my kitchen project. Bar my project manager was friendly. He make sure to keep me updated during the whole project. Also is team is very nice.
Homeowners on camera
-
Mark
-
Yoshio Inoue
-
Stephanie
-
Linda, Part 1
-
Clinton & Joan
-
Mr. Will
-
Teresa
-
Linda, Part 2
-
Michelle
-
Sarah & Robert
-
Clifford Harris
-
Rebecca
-
Mrs. Sergeant
-
Paul & Burley

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue, a short drive from Quilcene. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.
Bar UngerFounder, Volcano Builders
Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955
Remodeling services in Quilcene
Bathroom Remodeling
Bathroom remodels in Quilcene, from a first floor full bath to a small guest bath, with plumbing, tile, ventilation and lighting priced together.
Kitchen Remodeling
Quilcene kitchens laid out with cabinets, counters, lighting and appliances on one plan and one written price.
Basement Remodeling
Lower floors turned into living space, with the flood elevation rule checked first on lots near the two rivers.
Deck Building
Decks near Quilcene Bay or the rivers, placed once the shoreline buffer and flood maps for the lot are known.
ADU and DADU
The county allows one accessory unit per lot, capped at 1,250 square feet, with its certificate of occupancy posted inside.
Home Additions
New bedrooms and family rooms sized to the drainfield and to any flood elevation rule before drawings start.
Whole Home Renovation
Whole house renovations for Quilcene homes built before 1940, run as one project under one written price.
Siding
Siding repair, replacement and installation, with the barrier and flashing behind it done first.
Window Replacement
Replacement windows measured, ordered and installed, sized for egress, safety glass and energy rules.
Foundation Repair
Crack repair, drainage, basement waterproofing and seismic retrofits, engineered where the city requires it.
How your Quilcene remodel works
Three steps, one team, and a written price before anyone picks up a tool.
-
Consultation
We visit your home, walk the space and talk through your goals and budget.
-
Design and permits
We design the project, price it in writing and handle the Jefferson County building permit.
-
Build and hand over
One project manager runs the build through the final walkthrough.
Remodeling in unincorporated Quilcene: county permits, rivers, the bay and ADUs
Who issues the permit in Quilcene
Quilcene has no town government. It is an unincorporated community, one of only two places Jefferson County designates as a Rural Village Center, so building permits come from the county's Department of Community Development in Port Townsend. Applications are taken at a booked intake appointment, the documents go to the county's file share beforehand, and each one is checked for consistency with the Unified Development Code and the Comprehensive Plan. Some projects also need a land use approval, such as a variance or a shoreline substantial development permit.
The county's submittal checklist asks for a floor plan of the house before and after a remodel with every room labeled, a stormwater calculation worksheet with every building application, and an energy code worksheet. The same checklist lists the design criteria plans are drawn to: seismic design category D2, a frost line depth of 12 inches, and a roof snow load of 25 pounds per square foot, since the heavier 30 pound figure applies only in Brinnon and the West End.
Flood history on the Big and Little Quilcene
Jefferson County's flood hazard management plan for the two rivers, completed in June 2023, covers the lowest 4.3 miles of the Big Quilcene and the lowest 2.4 miles of the Little Quilcene. It records a 1993 flood that broke through a levee below Linger Longer Road, and a flood on 11 December 2014, the largest since 1996, that arrived with a 12.1 foot tide in Quilcene Bay and closed Linger Longer Road and Rodgers Street. The plan notes that Linger Longer Road was the only way in for about 70 homes as of 1998, and that most lots in the Hiddendale Drive subdivision along the Big Quilcene sit at least partly in the floodplain.
The plan expects more water, not less. A 2020 model that allowed for projected 2050 sea levels put the 100 year flood near Linger Longer Road at about 6,900 cubic feet per second, against the FEMA figure of 5,900 used in the plan, and it warns that high tides can back the rivers up even when rainfall upstream is modest. The county also maps channel migration zones on both rivers: ground where the channel is likely to move within 50 years is high risk, and within 50 to 100 years moderate.
Quilcene Bay, Lake Leland and the shoreline program
Waterfront work in Quilcene falls under the Jefferson County Shoreline Master Program, chapter 18.25 of the county code, in force since 21 February 2014. Its standard buffer for new development is 150 feet from the ordinary high water mark along marine shores such as Quilcene Bay and along rivers, and 100 feet along lakes.
Lake Leland, north of the village in the Little Quilcene basin, covers about 108 acres, and the county's flood plan notes that homes have already reshaped much of its shoreline. Away from the water, the county's critical areas code says its maps are only a general guide, so a lot can hold a wetland, stream or slope hazard the map does not show, and the county's own determination prevails where the two disagree.
Wells, the PUD system and septic in Quilcene
Jefferson County PUD No. 1 took over the Quilcene Water System from the U.S. Forest Service in 2005, partly because of benzene found in private wells nearby. It is a small Group A system with about 40 connections in the center of the village, fed by a 165 foot well. Outside it, homes rely on private wells or stream diversions under the Quilcene and Snow basin water rule that took effect in December 2009, and the county's flood plan flags Center Valley Road and Highway 101 between the Little Quilcene crossing and Lake Leland as places where shallow bedrock often yields too little water for a house.
The Port of Port Townsend studied a community septic system for the village in 2017. Septic systems are due for inspection every 12 to 36 months depending on their type, and under JCC 8.15 the county will not issue a septic permit for a system in a floodplain until the flood permits under JCC 15.15 are in place.
ADUs on a Quilcene lot
Under JCC 18.20.020, a legal lot with a single-family house may add one accessory dwelling unit of up to 1,250 square feet of gross floor area, and the owner must live in one of the two. A garage or shop can be converted or enlarged to hold it within the same limit, and the finished unit needs its own certificate of occupancy, posted inside.
For Quilcene lots the deciding step is usually water and septic: the county wants proof of an adequate potable supply and an approved on-site septic system for the new unit before it issues the permit. A travel trailer or recreational vehicle never counts as the ADU.
Quilcene houses and what they need
The Census Bureau's 2020 to 2024 American Community Survey counts about 231 homes in the census area, with a median build year of 1956, and roughly four in ten were built before 1940. About 159 are detached houses and about 42 are mobile homes, and about four in five occupied homes are lived in by their owners. Estimates for a place of about 360 people carry wide margins, so these are proportions, not exact counts.
The county's flood plan adds that most properties in Quilcene were developed before the county adopted its flood regulations in 1982. For houses that old, wiring, plumbing, insulation and foundation checks belong in the scope alongside the new finishes. The county's flood plan puts rainfall in the town at about 51 inches a year, with around 70 percent of it falling between November and May, so exterior work is planned around that season. We price each item on its own line in writing before work starts.
Permits: Jefferson County Department of Community Development building permit page and submittal checklist, checked September 2026. Flooding, water, septic and Lake Leland: Big and Little Quilcene Rivers Comprehensive Flood Hazard Management Plan (June 2023) and JCC 15.15 Flood Damage Prevention. Critical areas: Ordinance 01-0309-26, Appendix A (JCC 18.22, adopted 9 March 2026). Shorelines: Jefferson County Shoreline Master Program (JCC 18.25, effective 2014). ADUs: JCC 18.20.020. Septic in floodplains: JCC 8.15. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates, Quilcene CDP.
Quilcene remodeling questions
Who issues building permits in Quilcene?
Jefferson County does. Quilcene is unincorporated, so the county's Department of Community Development in Port Townsend reviews building permits, taking applications at a booked intake appointment with the documents uploaded to its file share ahead of time.
What should I ask a Quilcene remodeling contractor before hiring?
Ask for an active Washington contractor registration, which you can look up with the Department of Labor and Industries, and ask who will draw the plans and put together the county application. Ours is VOLCABI792C6; we prepare the drawings and the Jefferson County package and give you a written, itemized price before work starts.
How do I know if my Quilcene house is in a floodplain?
The county regulates flood zones from FEMA's flood insurance rate maps, based on the Flood Insurance Study for Jefferson County dated 7 June 2019. Much of the low ground along the Big and Little Quilcene rivers is mapped, and inside a mapped zone a remodel costing half the house's market value or more must meet the one foot elevation rule.
Can I add a bedroom to a house on septic in Quilcene?
That depends on the septic approval. Jefferson County will not accept a building application until a septic application is on file, and a system in a floodplain cannot get its septic permit until the county's flood permits are issued.
Can I build an ADU in Quilcene?
In most cases, yes. Jefferson County allows one ADU of up to 1,250 square feet on a lot with a single-family house, as long as the owner lives on the property and the water supply and septic approval are proven before the permit is issued.
What does a remodel in Quilcene cost?
Scope, the age of the house and any flood, shoreline or septic review set the price. You receive a written, itemized price before anything begins, and typical ranges by project type are in our Remodeling Pricing Guide.
Serving Quilcene
Volcano Builders 1750 112th Ave NE #B217 Bellevue, WA 98004 (206) 666-0412 Get directionsNearby cities














