Multi-Unit & Mixed-Use in Seattle, WA | Volcano Builders Skip to content

Multi-Unit & Mixed-Use in Seattle

A multifamily contractor for apartment buildings, townhome groups and buildings with shops below and homes above.

  • We read the drawings for every rated wall, rated floor and sound assembly before we price.
  • Occupied buildings are phased by floor or stack, with residents told what happens and when.
  • Loud or dusty tasks can be scheduled after hours or on weekends around residents and shops.

By appointment. Limited start dates.

  • Over 200 projects
  • 4.9 on Google
  • 20+ years building
  • WA license VOLCABI792C6
White four and five storey apartment buildings with glass and dark metal balconies, young trees staked in a lawn, a mesh fence and a quiet paved lane in autumn
Stock photo: low-rise apartment buildings with balconies and newly planted trees

Trusted to build for

UPS CBRE Patagonia Google CCRM Fertility Bayview Seniors Community
Who it is for

Buildings where many people share walls

Multi-unit work is judged on what residents hear, what a fire inspector opens up, and whether the retail floor stays open. These are the owners who usually reach out.

Owners and managers of existing apartments

Units, corridors and lobbies are tired, the envelope leaks in places, and the building is occupied. You want apartment building renovation that moves floor by floor while rents keep coming in.

Developers of small multifamily

Townhomes, a stacked flat building or a mixed use construction project with a storefront level. Your architect has drawn the separations; you need a builder who installs them exactly as listed and passes cover inspections.

HOA boards and commercial landlords

A condominium association planning common area and exterior work, or a landlord with homes above and a vacant shop below that needs a new tenant.

What we do

Work inside a multifamily or mixed-use building

Each area of the building brings its own code items. We carry them under one contract and one schedule.

Unit interiors

Kitchens, baths, flooring, doors and fixtures across a run of units, with the same finish package repeated so every apartment matches.

Corridors, lobbies and amenity rooms

Hallway finishes, lighting, mailrooms, fitness and community rooms, kept passable for residents while the work goes on.

Fire separations

Rated walls between units and between homes and shops, rated floor assemblies, and firestopping at every pipe, duct and wire that passes through them.

Sound between units

Resilient ceilings, insulated cavities, underlayment below hard floors and sealed openings, built to the tested assembly on the drawings.

Repainting halls or exteriors? See Commercial Painting in Seattle. Need help with the permit file itself? See Permit & Project Management in Seattle. Every service is listed in Commercial Construction in Seattle.

Minimal downtime

How we keep a lived-in building running

Residents and shop tenants stay put, so the plan starts with who is affected on each day.

  1. Survey units, stacks and common areas

    We walk a sample of units, the corridors, mechanical rooms and roof with your manager, and note where rated walls and floors will be opened.

  2. Phase by stack or floor

    You get a written scope, the permit list and a sequence that groups work by plumbing stack or floor. Resident notices go out through your office before each phase.

  3. Inspect before we close walls

    Rated assemblies and firestopping are left open for inspection before cover, noisy work can be scheduled after hours or on weekends near shops, and each phase is walked with you at handover.

Local knowledge

Permits and code for multi-unit buildings

  1. The Seattle rule

    Mixed-use counts as a commercial building

    For Seattle's building code, more than two dwelling units with no commercial tenants is a multifamily building, and any building with homes and commercial space is treated as commercial. New buildings go through plan review for zoning, drainage, building, fire, energy and accessibility, and SDCI usually issues the land use permit first.

    What we do

    We work with your architect on the permit path and track each review comment that touches construction.

  2. The state rule

    Units are separated by rated walls and floors

    Washington adopts IBC 420.2 in WAC 51-50: walls between dwelling units, and between units and other occupancies in the same building, are fire partitions. Floors between them are horizontal assemblies under IBC 420.3.

    What we do

    We build each rated assembly to the listing on the drawings and leave firestopped penetrations open for inspection.

  3. The sound rule

    STC 50 and IIC 50 between homes

    IBC 1206 requires walls and floor-ceilings between units, or next to public and service areas, to reach STC 50 in a lab test, and floor-ceilings to reach IIC 50. Pipe, outlet and duct openings must be sealed so the rating holds; unit entry doors are exempt but must fit tight.

    What we do

    We seal every opening in a rated wall or floor and check back boxes and duct runs before drywall.

In Bellevue, multifamily buildings with more than two units take a commercial building permit; a new building or addition of 4,000 square feet or more is a Major Commercial Project, with clearing and grading and a smoke control approval handled before or alongside it. Every contractor on site must be registered with L&I under RCW 18.27, and electrical work takes its own permit and inspections.

Proof

What an owner or board can verify

Boards and lenders ask for these before a multifamily contract is signed.

Washington license

Contractor license VOLCABI792C6 with L&I. Licensed, bonded and insured.

Checked subcontractors

Using an unregistered contractor is a gross misdemeanor under RCW 18.27.020, so each trade on your building is looked up with L&I before it starts.

Company record

20+ years in the region and over 200 projects company-wide, managed from our Bellevue office.

Rated 4.9 on Google

The average on the Volcano Builders Google profile, open for any board member to read.

Multi storey apartment building under construction with concrete frame, block infill walls, open balconies and orange safety netting along each floor edge
Stock photo: apartment building under construction with block walls and safety netting
Questions

Multifamily and mixed-use questions

Do you take on new multifamily buildings or only renovations?

Both. We work on small multifamily and mixed use construction from drawings, and on apartment building renovation in occupied buildings: unit interiors, common areas, separations, envelope and ground floor commercial space. For a building that starts from bare land, see Ground-Up Commercial Construction in Seattle.

How does Seattle classify a building with apartments over retail?

As a commercial building. SDCI treats any building with both homes and commercial tenants as commercial under its building code, while a building with more than two units and no commercial space is multifamily. New buildings of either kind need a construction permit, and usually a land use permit issued before it.

What fire separation is required between apartments and a shop below?

Rated construction on both planes. Under WAC 51-50 and IBC 420, walls between dwelling units, or between units and another occupancy, are fire partitions, and the floors between them are horizontal assemblies. The architect sets the rating; the builder installs and firestops it to match.

What sound rating is required between apartments?

STC 50 for airborne sound and IIC 50 for impact on floors, when lab tested. IBC 1206 applies this to walls and floor-ceilings between units and next to corridors or service areas, and requires openings for pipes, outlets and ducts to be sealed so the rating is kept.

Can residents stay while the building is renovated?

Usually, yes. Work is grouped by floor or plumbing stack, notices go out through the manager, entries stay open, and disruptive tasks can be scheduled after hours or on weekends near shops or offices.

What permit does a multifamily project need in Bellevue?

A commercial building permit, applied for on MyBuildingPermit. Bellevue files multifamily buildings with more than two units under commercial permits; new work of 4,000 square feet or more is a Major Commercial Project with its own grading and smoke control steps. See Permit & Project Management in Seattle.

Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book a walk of your building

Tell us about your project, investment range, and timeline. We’ll review the details and reach out to discuss your project and see if we’re the right fit.

Email Marketing
SMS Marketing