Home Remodeling Contractors in Bremerton, WA
Kitchen, bathroom, basement, deck and ADU projects for Bremerton houses, from wartime cottages to newer builds, designed, permitted and built by one licensed general contractor.
- We prepare the drawings and file them through the city's online permit portal.
- You approve a written, itemized price before any demolition.
- A single project manager answers your calls from the first sketch to final inspection.
By appointment. Limited start dates.
- Over 200 projects
- 4.9 on Google
- 20+ years building
- WA license VOLCABI792C6
Three Bremerton rules that shape a remodel
-
The Bremerton rule
Setbacks from the top and toe of a slope
Bremerton's critical areas code treats a slope steeper than 40 percent with at least 10 feet of vertical relief as a high geologic hazard, and bars any structure or impervious surface within 50 feet of its top and its toe. On a moderate hazard slope, 30 percent or more with the same relief, that buffer is 25 feet. Either one can shrink only when a geotechnical report shows the smaller buffer protects the house and the neighbors just as well.
What we doBefore design starts, we check your parcel on the critical areas layer of the Kitsap County parcel search that the city points owners to.
-
The Bremerton rule
Grading waits for the dry months
Clearing or grading on a high or moderate hazard slope, or anywhere within 200 feet of one, is limited to the window from May 1 to October 1. Work outside those dates needs an erosion and sedimentation control plan for wet weather, prepared by a professional licensed in Washington.
What we doOn a lot near a hazard slope, we book excavation and foundation work inside that May 1 to October 1 window.
-
The Bremerton rule
Inlets, bays and lakes within 200 feet
Every marine shoreline in the city falls under the Shoreline Master Program, from Sinclair Inlet and Port Washington Narrows to Ostrich, Oyster, Phinney and Mud Bays, along with Kitsap Lake, Twin Lakes, the Union River Reservoir and the lower mile of Gorst Creek. Jurisdiction reaches 200 feet inland from the water's edge plus associated wetlands, and it covers new or enlarged houses, sheds and decks. Even an exempt project needs a written exemption, issued after a complete application with a site plan.
What we doBefore a deck or addition is drawn near the water, we check your parcel against the city's shoreline maps.
Each of these is written into Bremerton's code or its shoreline program, so we check them for your lot before we write a price.
What homeowners say about working with us
Overall, we had a great time with Volcano Builders. There were a few small delays, but they were clear in their communication and kept things moving. The last kitchen remodel turned out great, and the quality seems like it will last for a long time.
I recently hired Bar from Volcano Builders to remodel my bathroom. Overall, the experience was satisfactory. Bar was professional and communicated well throughout the project. The work was completed on time and within budget. The quality of the remodel met my expectations, though there were a few minor details that could have been improved. I would recommend Bar for anyone looking for a reliable contractor for bathroom renovations.
Had a great experience working with Volcano Builders on remodeling bathroom and flooring in my condo! Bar and his team were very professional from estimates to timely completion of the job! Highly recommend!
Volcano Builders did a great job on our master bathroom. The tile work and finishing touches were great. Even though they weren't the cheapest quote we got, you can tell they care about quality.
I had a great time with Volcano Builders.The team was professional and on time, and the kitchen turned out just how we wanted it.
I just got my bathroom redone by Volcano, and Wow im in love With the final look! Bar was very communicative. Its feel like he was there with me every step of my way, making sure i was kept in the loop. His team was super friendly and professional. They made tge tge process smooth. My new bathroom is everything i hoped for and more. Thank you Volcano!
Homeowners on camera
-
Mark
-
Yoshio Inoue
-
Stephanie
-
Linda, Part 1
-
Clinton & Joan
-
Mr. Will
-
Teresa
-
Linda, Part 2
-
Michelle
-
Sarah & Robert
-
Clifford Harris
-
Rebecca
-
Mrs. Sergeant
-
Paul & Burley

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue, a short drive from Bremerton. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.
Bar UngerFounder, Volcano Builders
Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955
Remodeling services in Bremerton
Bathroom Remodeling
Bathrooms rebuilt from the subfloor up, with new waterproofing, plumbing lines, tile and fixtures.
Kitchen Remodeling
Bremerton kitchen remodeling for houses of every era: layout, cabinets, counters, lighting and the wiring behind them.
Basement Remodeling
Finished living space, a guest suite or a media room below the main floor.
Deck Building
Decks built or replaced, starting with the city's site plan questions about slopes, water and wetlands within 200 feet.
ADU and DADU
Bremerton allows a house plus two ADUs on one lot, with no owner occupancy rule and no required parking.
Home Additions
Extra bedrooms, bathrooms or living space, designed to match the existing house.
Whole Home Renovation
Several rooms or the whole house, planned and built as one project.
Siding
Siding repair, replacement and installation, with the barrier and flashing behind it done first.
Window Replacement
Replacement windows measured, ordered and installed, sized for egress, safety glass and energy rules.
Foundation Repair
Crack repair, drainage, basement waterproofing and seismic retrofits, engineered where the city requires it.
How your Bremerton remodel works
Three steps, one team, and a written price before anyone picks up a tool.
-
Consultation
We visit your home, walk the space and talk through your goals and budget.
-
Design and permits
We design the project, price it in writing and handle the City of Bremerton building permit.
-
Build and hand over
One project manager runs the build through the final walkthrough.
Bremerton remodeling guide: permits, shorelines, slopes, ADUs and older homes
Permits and review targets
Since March 16, 2020 the Department of Community Development has taken applications and payments online only, through the city's SmartGov public portal. Before applying, the city's Camino Permit Guide uses project type and GIS mapping to show which permit a job needs, the minimum submittal and any site constraints on the property; it gives guidance only, and the application itself is filed in the portal.
The residential site plan questionnaire asks about slopes, standing or flowing water and wetlands on the lot and within 200 feet of it. Grading of more than 50 cubic yards needs its own permit, and more than 2,000 square feet of new or replaced hard surface brings a stormwater management plan under BMC 15.04 and the state's 2019 stormwater manual for western Washington.
State law requires the city to report its permit timelines, and its monthly reports set a 60 day target for a new ADU and for smaller residential repairs, remodels and additions, and 90 days for larger ones. A shoreline exemption has a 45 day target. These are targets, not promises, and the reports show some months running over.
Shorelines
The city adopted its Shoreline Master Program on December 4, 2013, with limited amendments that took effect on September 7, 2017 and July 10, 2021. The marine waters of Puget Sound around Bremerton are a shoreline of statewide significance, which carries added policies.
The program is not retroactive. A house that was legally built but no longer meets today's shoreline height, buffer or setback standards counts as nonconforming and can be repaired and maintained, while an expansion or alteration is reviewed under the current rules.
The city is revising the Shoreline Master Program and the critical areas ordinance together, and a joint city and Department of Ecology public hearing was held on January 26, 2026. We check which version applies when your application is prepared.
Slopes, fill and critical areas
BMC 20.14 covers five kinds of critical area: wetlands, critical aquifer recharge areas, frequently flooded areas, geologically hazardous areas and fish and wildlife habitat. The city sends owners to the Kitsap County parcel search, set to its critical areas theme, as a first look, but the code calls every such map a guideline and settles each boundary on the site itself.
Steepness is not the only trigger. Ground prone to liquefaction in an earthquake, hydric soils and loose fill count as a moderate geologic hazard whatever the slope, and the department can ask for a geological report on any site with slopes of 15 percent or more and 10 feet of relief, or for a geotechnical report on land work within 200 feet of a hazard area.
ADUs and backyard cottages
Bremerton loosened its ADU code with Ordinances 5410 and 5416. A lot may hold one house and two accessory units, attached or detached, and the owner does not have to live on site. Each unit may reach 1,000 square feet or 60 percent of the house's habitable floor area, whichever is larger, so a house over 1,667 square feet can support a bigger unit. Since June 16, 2025 no parking space is required.
An ADU follows the zone's setbacks, height and lot coverage; in R-10 that means 15 feet front and rear and 5 feet on the sides. A unit can sit on a rear lot line that backs onto an alley, or 3 feet from a side line when that wall meets fire separation standards, and its siding and roofing should match the house.
Existing detached buildings put up before December 31, 2020 can be converted under relaxed standards, and the city takes part in a countywide program of six pre-approved ADU plans from 480 to 1,000 square feet. Either way, the application goes through the portal with a dimensioned site plan.
Housing stock
Bremerton's housing leans old. The Census Bureau's 2020 to 2024 American Community Survey puts the median year built at 1969, close to one home in five dates from 1939 or earlier, and another one in seven went up in the 1940s, the wartime boom the city's own ADU guide recalls. Nearly two thirds were built before 1980.
Only about half of the housing is detached single-family, and slightly more households rent than own. For an owner of an older house, opening a wall can reveal wiring, plumbing or insulation that has to be brought up to current code, and we price that possibility in writing before work starts.
Permits and targets: City of Bremerton Department of Community Development pages, handouts and monthly permit reports, 2025 and 2026. Shorelines: Bremerton Shoreline Master Program (2013, amended 2017 and 2021) and its FAQ. Critical areas: BMC 20.14. ADUs: BMC 20.46 and the city ADU page. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates.
Bremerton remodeling questions, answered
Do I need a permit to remodel my house in Bremerton?
For most remodels, additions and decks, yes. The Department of Community Development accepts applications only online, through its SmartGov portal, and a lot near a slope or the shoreline brings extra review. We draw the plans and handle the filing for our clients.
How long does a Bremerton building permit take?
The city's published target is 60 days for a new ADU and for smaller residential remodels and additions, and 90 days for larger ones. It reports its results monthly, and some months run past the target, so we plan your start date with room for that.
How many ADUs can I build on a Bremerton lot?
Two, alongside the main house, for up to three homes on the lot. Each ADU can be 1,000 square feet or 60 percent of the house's habitable floor area, whichever is larger, and the city requires neither owner occupancy nor a parking space.
My Bremerton lot is on a steep slope. Can I still add on?
Often, with care. On a slope over 40 percent with 10 feet of relief, new structures stay 50 feet from the top and toe unless a geotechnical report supports less, and on a 30 percent slope the buffer is 25 feet. Grading near those slopes runs from May 1 to October 1 unless a wet weather erosion plan is approved.
What should I ask Bremerton contractors before hiring one?
Start with an active Washington Department of Labor and Industries contractor registration; ours is VOLCABI792C6. Then ask who draws the plans, who files them in the city portal, and whether you get an itemized, written price before work starts. On our projects the answer to all three is us.
What does a remodel cost in Bremerton?
It depends on scope: moving walls, plumbing or gas lines costs more than keeping a layout, and a house built before 1980 can need electrical or plumbing updates once it is opened. We give you a written, itemized price before work begins, and typical ranges by project type are in our Remodeling Pricing Guide.
Serving Bremerton
Volcano Builders 1750 112th Ave NE #B217 Bellevue, WA 98004 (206) 666-0412 Get directionsNearby cities














