Condo Bathroom Remodel in Renton, WA

We refitted both bathrooms of this Renton condo in 2024 as part of a remodel of the whole unit. The primary bath was reframed and redrywalled, then given a gray shaker vanity with a white counter, a wide mirror and a sliding glass shower door over new tile. The hall bath got a new counter, mirrors and fixtures beside its tiled tub surround. Both rooms share the plank floor laid through the rest of the unit.

City
Renton, WA
Home type
Condominium unit
Service
Bathroom remodel, two bathrooms
Scope
Primary bath: framing, doors and drywall, vanity, shower glass, tile, fixtures. Hall bath: counter, mirror, recessed mirror, fixtures
Year
2024, finished photos taken September 5, 2024
Contractor
Volcano Builders, WA license VOLCABI792C6
Approximate investment
About $25,000

Every project is priced in writing, line by line, for your home.

Bathroom with a gray shaker vanity, white counter with two faucets, wide mirror and a light bar above
Renton primary bath: gray shaker vanity under a wide mirror
After

The finished bathrooms

Bathroom with a gray shaker vanity, white counter with two faucets, wide mirror and a light bar above
Renton primary bath: gray shaker vanity under a wide mirror
Tiled shower with a sliding glass door, brushed nickel handle and a towel bar beside it
The tiled shower behind its sliding glass door
Vanity wall with a gray shaker cabinet, white counter, mirror and light bar beside the bathroom door
The vanity wall seen from the doorway, with the new door and trim
Hall bathroom with a white vanity, large mirror and a tub with a light gray tile surround
Renton hall bath: white vanity, mirror and tiled tub surround

Know someone planning a project like this? Refer them: you get $500 cash or $1,500 credit, they get $500 off.

The project

How these Renton condo bathrooms came together

The goal

Both bathrooms needed to match the rest of a condo that was being remodeled top to bottom. The primary bath called for a full refit, from the walls out. The hall bath needed a lighter touch: a new counter, new mirrors and new fixtures to bring it in line with the first.

The challenge

In the primary bathroom the framing, doors and drywall had to be redone before anything else could go in, and that had to fit around plumbing and electrical work happening across the whole unit. Everything also had to suit a compact condo footprint, where the vanity, toilet and shower sit close together. The new shower glass could only be measured and installed once the tile was finished and set.

The solution

We reframed and redrywalled the primary bath, hung new doors, and coordinated the plumbing and electrical rough in with the rest of the unit. Tile went in next. Then we installed a gray shaker vanity with a white counter and two faucets, a wide mirror with a light bar, and a sliding glass door on the tiled shower. In the hall bath we fitted a new counter, a mirror and a recessed mirror cabinet, and new fixtures. The same plank floor that runs through the condo was carried into both rooms.

The result

Photographed finished on September 5, 2024, the primary bath has clean gray cabinetry, brushed nickel fixtures and a bright glass enclosed shower. The hall bath pairs a white vanity with a light gray tiled tub surround. Both bathrooms now look like part of the same home as the kitchen, living room and bedrooms around them.

Keep reading

Part of the same project: Whole Condo Remodel in Renton, WA, Condo Kitchen Refresh in Renton, WA, Luxury Vinyl Plank Condo Flooring in Renton, WA

Questions

Questions about this project

Can two bathrooms get different levels of work in one project?

Yes. In this Renton condo the primary bath was reframed and fully refitted, while the hall bath kept its tub and surround and got a new counter, mirrors and fixtures. Both were scheduled together, so the trades came through once.

What was installed in the primary bathroom?

A gray shaker vanity with a white counter and two faucets, a wide mirror with a light bar, new tile, new fixtures, and a sliding glass door on the shower, all after the framing, doors and drywall were redone.

How much did this project cost?

About $25,000. Every project is priced in writing, line by line, for your home.

How do I get a price for a bathroom remodel like this one?

Book a consultation. We measure the room, talk through the scope and send a written, itemized price before work starts. For what moves the price of a bathroom, read Cost of a Bathroom Remodel in the Greater Seattle Area.

Next steps

Before you book

Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your bathroom consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?