Tenino Home Remodeling Contractors | Volcano Builders Skip to content

Home Remodeling Contractors in Tenino, WA

Kitchens, bathrooms, additions, decks and ADUs for homes in Tenino, planned around Scatter Creek, the valley floor that floods in winter and the city's own building desk.

  • We draw the plans and hand the permit application to the City Clerk's Office for you.
  • You see a written, itemized price before any demolition begins.
  • A single project manager stays on your job through the last inspection.

By appointment. Limited start dates.

  • Over 200 projects
  • 4.9 on Google
  • 20+ years building
  • WA license VOLCABI792C6
Finished attic room with new gray carpet, sloped ceilings and built-in closet doors, from a Kirkland attic remodel by Volcano Builders
Attic remodel, Kirkland, WA
Local knowledge

Three Tenino rules that shape a remodel before it is drawn

  1. The Tenino rule

    Scatter Creek's shoreline band

    Scatter Creek is the one stream inside city limits that Tenino's Shoreline Master Program regulates. Its jurisdiction reaches 200 feet landward of the ordinary high water mark and takes in associated wetlands. On land designated Urban Conservancy, a single-family home must sit outside the critical area buffer, stay within 35 feet in height and keep impervious surfaces to 30 percent of the site, at a density of one dwelling per acre.

    What we do

    Before a deck, addition or new roofline is sketched, we check whether your parcel falls inside the Scatter Creek shoreline band.

  2. The Tenino rule

    Winter water on the valley floor

    Tenino regulates flood areas from the FEMA flood insurance rate maps for Thurston County dated October 16, 2012. In those areas, new homes and substantially improved ones must put the lowest floor, basement included, at least one foot above the base flood elevation, and a smaller side addition is built at the same floor height as the house. The city's draft plan notes flooding along Scatter Creek, in City Park and around Huston Street, recorded in the 1997 flood.

    What we do

    We look up your address on the flood maps the city adopted before any floor plan is drawn.

  3. The Tenino rule

    Slopes around the valley

    The critical areas code treats slopes of 40 percent or more with at least 10 feet of vertical relief, and slopes over 15 percent where permeable sediment lies over a less permeable layer and groundwater seeps out, as landslide hazard areas. Work keeps a buffer equal to the slope's height, which a licensed engineer or geologist can justify cutting to as little as 10 feet, and clearing is allowed only in the dry season, generally from May 1 to October 1.

    What we do

    Any clearing near a mapped slope goes on your schedule inside the city's May to October dry season window.

All three are read from the city's code and maps for your address during design.

Reviews

What homeowners say about working with us

4.9 on Google See our Google profile
Tom PfizenmaierGoogle review, July 2025
★★★★★

Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.

Yana ShavlovskyGoogle review, February 2025
★★★★★

Volcano builders did a phenomenal job on my bathroom remodel. They exceeded my expectations on many levels. Their designer helped me pick out all the tile and bathroom accessories to make sure everything matched in style. Communication was great and response time very fast whenever I had questions for them. They estimated the project would take 5-6 weeks but finished in 4 weeks! Excellent job! Loooooove my new bathroom! Including pics of the Before… and the After!

Cassidy SchukarGoogle review, March 2025
★★★★★

I had an amazing experience with Volcano Builders! Bar was incredibly kind, communicative, and made the whole process smooth. We completely redid the bathroom,new flooring, vanity, tub, and wall tiles, and it turned out fantastic. I'm so happy with their work that I'm already planning my second bathroom and hopefully the kitchen too. Highly recommend them to anyone looking for quality work and great service!

Winnie CGoogle review, February 2024
★★★★★

Gad an amazing experience with Volcano Builders on my kitchen project. Bar my project manager was friendly. He make sure to keep me updated during the whole project. Also is team is very nice.

L UGoogle review, January 2025
★★★★★

I recently hired Bar from Volcano Builders to remodel my bathroom. Overall, the experience was satisfactory. Bar was professional and communicated well throughout the project. The work was completed on time and within budget. The quality of the remodel met my expectations, though there were a few minor details that could have been improved. I would recommend Bar for anyone looking for a reliable contractor for bathroom renovations.

Kiyara BatraGoogle review, April 2026
★★★★★

I had a great time with Volcano Builders.The team was professional and on time, and the kitchen turned out just how we wanted it.

Homeowners on camera

  • Mark

  • Yoshio Inoue

  • Stephanie

  • Linda, Part 1

  • Clinton & Joan

  • Mr. Will

  • Teresa

  • Linda, Part 2

  • Michelle

  • Sarah & Robert

  • Clifford Harris

  • Rebecca

  • Mrs. Sergeant

  • Paul & Burley

Bar Unger, founder of Volcano Builders

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.

Bar UngerFounder, Volcano Builders

Read our story

Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955

Services

Remodeling services in Tenino

Process

How your Tenino remodel works

Three steps, one team, and a written price before anyone picks up a tool.

  1. Consultation

    We visit your home, walk the space and talk through your goals and budget.

  2. Design and permits

    We design the project, price it in writing and handle the City of Tenino building permit.

  3. Build and hand over

    One project manager runs the build through the final walkthrough.

Guide

Remodeling in Tenino: permits, Scatter Creek, slopes and ADUs

How a Tenino building permit moves

The City of Tenino runs its own Building Department. The building permit application is one of the forms on the city's website, and the city's fee schedule directs every application to the City Clerk's Office, which accepts it in person, by mail or by email. Building fees are figured from Thurston County's building fee tables rather than a separate city table.

Electrical work is the exception: the city's code leaves the electrical code to the state, so wiring is permitted and inspected by the Washington State Department of Labor and Industries. Plumbing, mechanical and building inspections stay with the city.

A Tenino permit expires if work has not started within 180 days of issue, or if work stops for 180 days. The building official can grant one extension of up to 180 days on a written request, so we set your start date once the permit is in hand.

Scatter Creek, floods and wetlands

Scatter Creek runs low in summer and floods in winter, and the land beside it is mapped as floodplain. The city's draft plan places most of Tenino's wetlands along the creek and south of the Yelm to Tenino Trail in City Park, and records coho salmon and cutthroat trout in the creek.

Inside a mapped flood area the building code goes beyond floor height. An enclosed space below the lowest floor has to let floodwater in and out through at least two openings, sized at one square inch for every square foot of enclosed area, with their bottoms no more than a foot above grade. The critical areas code also bars septic systems and drain fields anywhere in the 100-year floodplain.

The aquifer under the valley and the hills around it

Most of Tenino sits on a flat valley floor of porous prairie soil, and the city's draft plan maps an extreme critical aquifer recharge area under most of it. The city draws all of its drinking water from a shallow, unconfined aquifer, so the critical areas code only allows activity there when it will not let contaminants reach the groundwater.

The hills to the north, south and west are steeper, forested and broken by sandstone outcrops. Where a slope qualifies as a landslide or erosion hazard, the code prohibits septic drain fields and forbids discharging roof drains onto or above the slope, and vegetation stays in place unless the city approves an alteration.

Accessory dwelling units and backyard buildings

Tenino's zoning code allows one accessory dwelling unit per lot of record, with up to 1,000 square feet of habitable floor area, attached to the house or detached from it. Whichever form it takes, the unit has to closely match the main house in design, color scheme and roof materials, and in the single-family, duplex, multifamily and West Tenino zones it needs an administrative use permit. ADUs are not counted in residential density.

A garage or other accessory building larger than 120 square feet and up to 1,000 square feet, and no taller than 14 feet, may go in a rear or side yard in the residential zones if it stays 5 feet from the property line and 6 feet from a neighbor's house. The city's tree preservation standards exempt building permits for single-family houses.

Tenino houses and what opening a wall reveals

The Census Bureau's 2020 to 2024 American Community Survey puts the median Tenino home at 1980. About half of the homes were built before 1980 and roughly one in six before 1940, while about three in four are detached single-family houses. Margins are wide for a city this size, yet the older stock is plain to see.

The city's design standards, written to protect a downtown that has changed little since its 1906 fire, ask new commercial buildings for a sandstone element, but they do not apply to single-family houses or duplexes. For an older house the practical questions sit inside the walls: wiring, plumbing and insulation from earlier decades, which we allow for in the itemized price.

Permits: City of Tenino forms page, Resolution 2025-03 Consolidated Fee Schedule and Tenino Municipal Code Title 5. Shoreline: City of Tenino Shoreline Master Program (2012). Floods, slopes and aquifer: Tenino Municipal Code Title 5 Chapter 5.24 and Title 112, with place descriptions from the draft Tenino Comprehensive Plan 2025 to 2045. ADUs and design standards: Tenino Municipal Code Title 108. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates.

Questions

Tenino remodeling questions, answered

Does a kitchen remodel in Tenino need a permit?

It depends on what changes. The city's building code exempts painting, tile, cabinets and countertops, but moving or adding plumbing takes a city plumbing permit, and new circuits need an electrical permit from the state Department of Labor and Industries, because Tenino leaves electrical work to the state.

Where do I apply for a building permit in Tenino?

With the City of Tenino. The application form is on the city's website, and completed applications go to the City Clerk's Office in person, by mail or by email. On our projects we prepare the drawings and submit the package ourselves.

Can I add an ADU to my Tenino property?

Often, yes. City zoning allows one accessory dwelling unit per lot, attached or detached, with up to 1,000 square feet of living space, designed to match the house, and it needs an administrative use permit. A lot near Scatter Creek or on a hazard slope also has to meet those rules first.

My house is near Scatter Creek. What changes?

Land within 200 feet of the creek's ordinary high water mark, plus associated wetlands, falls under the city's Shoreline Master Program, and the creek's floodplain brings the flood code's floor height rules. Additions and decks there are planned around both from the first sketch.

Do I need a permit for a new deck in Tenino?

Not for a low one. A deck no more than 30 inches above the ground and not over a basement or lower story is exempt from a building permit under the city's code; a taller deck needs one, and a deck inside the Scatter Creek shoreline band still has to meet that program.

What does a Tenino home remodel cost?

It depends on scope and on what the house needs once it is opened up: moving plumbing, walls or wiring costs more than refreshing a room in place. You receive a written, itemized price before work starts, and typical ranges by project type are in our Remodeling Pricing Guide.

Service area

Serving Tenino

Volcano Builders 1750 112th Ave NE #B217 Bellevue, WA 98004 (206) 666-0412 Get directions

Nearby cities

Map of the Tenino city limits
City limits, land and water: U.S. Census Bureau.
Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your Tenino consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?