Lacey Home Remodeling Contractors | Volcano Builders Skip to content

Home Remodeling Contractors in Lacey, WA

Kitchens, bathrooms, decks, additions and ADUs for Lacey homes, from lake lots on Hicks and Pattison to the planned communities of Hawks Prairie, with drawings, city permits and construction under one licensed team.

  • We prepare the plan set and send the city its residential remodel application.
  • A written, itemized price is agreed before any demolition.
  • A single project manager stays with the job through the last city inspection.

By appointment. Limited start dates.

  • Over 200 projects
  • 4.9 on Google
  • 20+ years building
  • WA license VOLCABI792C6
Walk-in shower in large charcoal tile with a lit niche and matte black controls, a Kirkland bathroom remodel by Volcano Builders
Bathroom remodel, Kirkland, WA
Local knowledge

Three Lacey rules that shape a remodel before it starts

  1. The Lacey rule

    Five lakes, a creek and the Nisqually Reach

    Lacey's Shoreline Master Program covers Chambers, Hicks, Long, Pattison and Southwick Lakes, Woodland Creek and the Nisqually Reach, and for a lake its reach runs 200 feet landward of the ordinary high water mark, plus associated wetlands. A legally built house that sits inside the newer water setback is classed "conforming, expansion limited", so an addition toward the lake is weighed like the expansion of a nonconforming structure, while a garage, shed or deck inside that setback is labelled nonconforming.

    What we do

    Before a lakefront addition or deck is sketched, we check your parcel against the city's shoreline map.

  2. The Lacey rule

    Ravines and hillsides stay green

    Lacey's geologically sensitive areas code treats any slope of 15 percent or more as a hillside. Ravine sidewalls, bluffs and slopes steeper than 40 percent stay undeveloped, a 50 foot buffer of undisturbed native plants runs from the top, toe and sides of every ravine sidewall and bluff, and buildings stay another 10 feet back from the edge of that buffer. Work in these areas starts with a presubmission conference at the city.

    What we do

    We look up your address on the city's slope and ravine maps before any design work.

  3. The Lacey rule

    Every tree removal is on paper

    Taking out any tree on a Lacey residential lot needs either a land clearing permit exemption or a land clearing permit. The exemption covers up to three trees in 60 months, and trees within ten feet of a new house's construction line; more than three in that window means a full land clearing permit after a presubmission conference. Either way the lot must keep at least four trees per 5,000 square feet.

    What we do

    Existing trees go onto the site plan we prepare, so the permit set shows which ones stay.

Each of these is a map or code check that happens before the design is settled.

Reviews

What homeowners say about working with us

4.9 on Google See our Google profile
Brian LiuGoogle review, April 2026
★★★★★

Volcano Builders did a great job on our master bathroom. The tile work and finishing touches were great. Even though they weren't the cheapest quote we got, you can tell they care about quality.

Tom PfizenmaierGoogle review, July 2025
★★★★★

Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.

Cassidy SchukarGoogle review, March 2025
★★★★★

I had an amazing experience with Volcano Builders! Bar was incredibly kind, communicative, and made the whole process smooth. We completely redid the bathroom,new flooring, vanity, tub, and wall tiles, and it turned out fantastic. I'm so happy with their work that I'm already planning my second bathroom and hopefully the kitchen too. Highly recommend them to anyone looking for quality work and great service!

Sarah ChartrandGoogle review, February 2024
★★★★★

I just got my bathroom redone by Volcano, and Wow im in love With the final look! Bar was very communicative. Its feel like he was there with me every step of my way, making sure i was kept in the loop. His team was super friendly and professional. They made tge tge process smooth. My new bathroom is everything i hoped for and more. Thank you Volcano!

Garvit WisdomGoogle review, April 2026
★★★★★

We were nervous about hiring a contractor because we were first-time homeowners, but Volcano Builders made it easy to understand. They made everything clear and helped us stick to our budget. I'm very happy with how everything turned out.

L UGoogle review, January 2025
★★★★★

I recently hired Bar from Volcano Builders to remodel my bathroom. Overall, the experience was satisfactory. Bar was professional and communicated well throughout the project. The work was completed on time and within budget. The quality of the remodel met my expectations, though there were a few minor details that could have been improved. I would recommend Bar for anyone looking for a reliable contractor for bathroom renovations.

Homeowners on camera

  • Mark

  • Yoshio Inoue

  • Stephanie

  • Linda, Part 1

  • Clinton & Joan

  • Mr. Will

  • Teresa

  • Linda, Part 2

  • Michelle

  • Sarah & Robert

  • Clifford Harris

  • Rebecca

  • Mrs. Sergeant

  • Paul & Burley

Bar Unger, founder of Volcano Builders

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.

Bar UngerFounder, Volcano Builders

Read our story

Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955

Services

Remodeling services in Lacey

Process

How your Lacey remodel works

Three steps, one team, and a written price before anyone picks up a tool.

  1. Consultation

    We visit your home, walk the space and talk through your goals and budget.

  2. Design and permits

    We design the project, price it in writing and handle the City of Lacey building permit.

  3. Build and hand over

    One project manager runs the build through the final walkthrough.

Guide

Lacey remodeling guide: permits, lakes, slopes, ADUs and housing age

Applying for a permit in Lacey

Building permits come from the Community and Economic Development Department at City Hall. A remodel or addition goes in by email to the Building Division: the Residential Remodel or Addition form, a fully dimensioned site plan showing every property line, construction documents, any engineering calculations and the energy code forms. Staff aim to finish intake within 24 to 48 hours and then send the next steps.

For a residential addition, alteration or remodel the city asks applicants to allow two weeks of plan review. Smaller jobs move faster: a water heater swap, a new electrical circuit, re-roofing or re-siding can be issued over the counter, and electrical, HVAC, solar and residential roof permits can be requested through the online portal, where the city aims to issue them within 24 to 48 hours.

Inspections are booked by email or phone, Monday to Friday between 8 a.m. and 5 p.m., at least one day ahead. The city cannot promise a set time, only a morning or afternoon preference, and a call at 8 a.m. on the day gives the approximate window.

What needs a permit, and the design numbers

Finish work such as painting, papering, tiling, carpeting, cabinets and counter tops needs no building permit in Lacey. Neither does a one story shed or playhouse of up to 200 square feet behind a house or duplex, provided it stays 5 feet from the side line and 3 feet from the rear line, a fence of up to 7 feet, or a retaining wall of up to 4 feet that meets the setback conditions. Decks have no exemption.

Lacey builds to the International Residential Code, International Existing Building Code and Washington State Energy Code as adopted by the state, and administers electrical work under the National Electrical Code as amended by the state and the city. Its published design criteria are a ground snow load of 25 psf, a wind speed of 85 mph, seismic design category D1 and a frost depth of 12 inches.

Lakes, wetlands and Woodland Creek

Lakefront lots where homes already stand carry the Shoreline Residential designation. The large wetland system that links Woodland Creek with Hicks, Pattison and Long Lake is designated Natural, and most of it remains undeveloped. A shoreline exemption is a staff decision, while a shoreline substantial development permit, conditional use or variance goes before the city's Hearings Examiner.

Away from the shorelines, wetland buffers under LMC 14.28 are sized from the state's wetland rating system by category and habitat score. Beyond the buffer, the city adds a building setback line equal to the zone's yard setback, drawn on a site plan that is recorded with a notice on the property title.

Building on a Lacey hillside

On a lot with slopes, LMC 14.37 caps how much ground may be disturbed: all of the flat area, 60 percent of slopes between 15 and 25 percent, 45 percent of slopes between 25 and 40 percent, and none of anything steeper. Foundations are tiered to follow the existing grade, and the code prefers retaining walls that keep natural slope over graded artificial banks.

The 50 foot ravine and bluff buffer can be narrowed, by no more than half, only when expert study shows the construction method will not add erosion or slide risk.

ADUs in Lacey

Lacey's own code allows one accessory dwelling unit per lot, limited to half the size of the main house and no more than 850 square feet, set 10 feet from the main structure with at least one assigned parking space, and reviewed through a residential design review application. Where state ADU law under House Bill 1337 conflicts with local code, the state rules apply, so the standard in force is confirmed with planners before design.

The city suggests meeting its staff before applying and names lots of 10,000 square feet or more as the strongest candidates. With one of its pre-approved plans and a complete application, it expects approval within about two weeks.

A young housing stock with older pockets

The Census Bureau's 2020 to 2024 American Community Survey puts the median year built at 1996, with more than six in ten homes built in 1990 or later and about one in four before 1980. Nearly six in ten are detached single-family houses.

The city itself dates only from 1966, but the Lacey Historic Neighborhood was its main residential area until after World War II, and the city's planning documents note that much of the housing around the lakes was built on septic tanks and drain fields.

Permits and exemptions: City of Lacey Community and Economic Development, permitting and construction permit pages and Form RAA-2, September 2026. Shorelines: Lacey Shoreline Master Program, 2021 update. Slopes, wetlands and trees: Lacey Municipal Code 14.37, 14.28 and the city tree permit page. ADUs: LMC 14.23.071, the city ADU guide, ADU FAQ and middle housing notice. Housing stock: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates.

Questions

Lacey remodeling questions, answered

Do I need a permit to remodel a bathroom in Lacey, WA?

It depends on what changes. New tile, cabinets and counter tops are finish work the city exempts, but once a concealed drain or supply pipe is removed and replaced, Lacey counts it as new plumbing work that needs a permit and an inspection. For a full remodel we send the Residential Remodel or Addition form with its site plan and the plumbing and electrical applications.

Does a deck need a permit in Lacey?

Yes. The city's exemption list covers small sheds, fences and low retaining walls and then states that there is no exception for decks. For a smaller project like a deck or porch, Lacey invites homeowners to call or visit City Hall and talk with a planner or construction inspector first.

Can I add an ADU to my Lacey lot?

Usually. The city's local code allows one per lot, up to half the size of the house and no more than 850 square feet, and Lacey has four pre-approved detached plans from 480 to 800 square feet. Where state ADU law conflicts with the local code, the state rules apply, so we confirm the limits in force with its planners before design.

My house is on Hicks, Long or Pattison Lake. What changes?

Land within 200 feet of the lake's ordinary high water mark falls under Lacey's Shoreline Master Program. If the house is inside the newer water setback it is classed "conforming, expansion limited", so an addition toward the water is reviewed like the expansion of a nonconforming structure. We check the shoreline map for your parcel before a plan is drawn.

How do I compare remodeling contractors in Lacey, WA?

Start with an active Washington contractor registration with the Department of Labor and Industries, then ask who prepares the drawings and who sends the application to the city. Lacey's remodel form asks for each contractor's license number and Lacey endorsement number. Our registration is VOLCABI792C6, and you get a written, itemized price before work begins.

What does a kitchen remodel in Lacey, WA cost?

Scope sets the number: moving a sink, range or wall costs more than keeping the layout, and plumbing, mechanical and electrical changes each add their own application. You receive a written, itemized price before any work starts, and typical ranges by project type are in our Remodeling Pricing Guide.

Service area

Lacey neighborhoods we serve

  • Lacey Historic Neighborhood
  • Hawks Prairie
  • Horizons
  • Lakes
  • Pleasant Glade
Volcano Builders 1750 112th Ave NE #B217 Bellevue, WA 98004 (206) 666-0412 Get directions

Nearby cities

Map of the Lacey city limits
City limits, land and water: U.S. Census Bureau.
Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your Lacey consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?