Home Remodeling Contractors in Pacific, WA
Kitchens, bathrooms, additions, decks and ADUs for Pacific homes on the White River valley floor and the West Hill, planned around the city's flood, shoreline and ADU codes.
- We prepare the drawings and submit your application through the city's SmartGov portal.
- A written, itemized price is in your hands before any work begins.
- One project manager stays with the job from design to the final city inspection.
By appointment. Limited start dates.
- Over 200 projects
- 4.9 on Google
- 20+ years building
- WA license VOLCABI792C6
Three Pacific rules to know before a plan is drawn
-
The Pacific rule
Flood maps from the 2020 King County study
Pacific regulates flood hazard areas from FEMA's Flood Insurance Study for King County and Incorporated Areas, dated August 19, 2020, and a development permit is required before any construction in an area of special flood hazard. Where a base flood elevation has been set, a new home or a substantial improvement, meaning work that costs 50 percent or more of the structure's market value, must put its lowest floor, basement included, at least one foot above that elevation, with mechanical equipment and utilities elevated or waterproofed to the same line.
What we doBefore design starts, we check your address against the city's flood insurance rate maps.
-
The Pacific rule
Three quarters of a mile of White River
Pacific's Shoreline Master Program, which took effect on October 30, 2019, covers about 0.75 mile of the White River, a shoreline of statewide significance. Because the FEMA maps draw no floodway inside the city, shoreline jurisdiction is measured 200 feet landward from the waterward edge of the levees. In the Shoreline Residential designation, impervious surface within 100 feet of the ordinary high water mark is capped at 30 percent, and a house must stand back the width of the critical area buffer plus 10 feet.
What we doWe compare your lot with the city's official shoreline map before a deck or addition is sketched.
-
The Pacific rule
Steep ground on the West Hill
The city's western slopes climb above 300 feet, and chapter 23.50 of the municipal code treats any slope of 40 percent or more with at least 10 feet of vertical relief as a landslide hazard area. A critical areas report there can recommend limits on clearing during the rainy season, generally October 1 to May 1. An addition of less than 250 square feet to a single-story house is exempt from the chapter.
What we doAny rainy season clearing limit in the report goes into your schedule before the permit is filed.
Each answer ends up in the drawings, well before a crew parks on your street.
What homeowners say about working with us
Bar and the team at Volcano Builders did a great job! Professional service, great communication throughout the whole process, and everything was done with care and attention to detail. Highly recommend!
I recently hired Bar from Volcano Builders to remodel my bathroom. Overall, the experience was satisfactory. Bar was professional and communicated well throughout the project. The work was completed on time and within budget. The quality of the remodel met my expectations, though there were a few minor details that could have been improved. I would recommend Bar for anyone looking for a reliable contractor for bathroom renovations.
Had a great experience working with Volcano Builders on remodeling bathroom and flooring in my condo! Bar and his team were very professional from estimates to timely completion of the job! Highly recommend!
Bar's team completely transformed my outdated Seattle bathroom with their exceptional work. Their communication was excellent, keeping me informed every step of the way. The quality of their workmanship exceeded my expectations, turning my old bathroom into what I wanted. I highly recommend Bar and his team for any remodeling project; they're professional, efficient, and produce outstanding results.
Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.
I just got my bathroom redone by Volcano, and Wow im in love With the final look! Bar was very communicative. Its feel like he was there with me every step of my way, making sure i was kept in the loop. His team was super friendly and professional. They made tge tge process smooth. My new bathroom is everything i hoped for and more. Thank you Volcano!
Homeowners on camera
-
Mark
-
Yoshio Inoue
-
Stephanie
-
Linda, Part 1
-
Clinton & Joan
-
Mr. Will
-
Teresa
-
Linda, Part 2
-
Michelle
-
Sarah & Robert
-
Clifford Harris
-
Rebecca
-
Mrs. Sergeant
-
Paul & Burley

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue, a short drive from Pacific. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.
Bar UngerFounder, Volcano Builders
Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955
Remodeling services in Pacific
Bathroom Remodeling
Bathroom remodels in Pacific, from a tub to shower conversion to a full primary suite, with the city plumbing permit filed when the work calls for one.
Kitchen Remodeling
Kitchen layouts, cabinets, counters and lighting for Pacific houses, drawn as one plan, with plumbing permitted by the city and electrical by the state.
Basement Remodeling
Finishing a lower level on the valley floor starts with the flood map, because the city counts a basement as the lowest floor.
Deck Building
Decks and covered patios drawn to the city's Basic Decks handout, with the shoreline setback checked for lots near the river.
ADU and DADU
Pacific allows attached and detached ADUs of up to 1,000 square feet and 25 feet tall on lots in its RS residential zones.
Home Additions
Room additions and second stories, with the flood rule on substantial improvements checked before the floor plan is fixed.
Whole Home Renovation
Whole house remodels for Pacific homes built from the 1970s through the 2000s, run as a single project on one schedule.
Siding
Siding repair, replacement and installation, with the barrier and flashing behind it done first.
Window Replacement
Replacement windows measured, ordered and installed, sized for egress, safety glass and energy rules.
Foundation Repair
Crack repair, drainage, basement waterproofing and seismic retrofits, engineered where the city requires it.
How your Pacific remodel works
Three steps, one team, and a written price before anyone picks up a tool.
-
Consultation
We visit your home, walk the space and talk through your goals and budget.
-
Design and permits
We design the project, price it in writing and handle the City of Pacific building permit.
-
Build and hand over
One project manager runs the build through the final walkthrough.
Remodeling in Pacific, WA: SmartGov permits, the White River, ADUs and housing age
How a Pacific permit moves
The City of Pacific runs its own building department on both sides of the King and Pierce county line. It issues building, mechanical and plumbing permits, reviews the plans and sends its own inspector to the site, working from the International Residential Code and International Existing Building Code as adopted and amended by the state. Building and land use applications go in through SmartGov, the city's online permit portal, where drawings and supporting documents are uploaded. Electrical permits are not the city's: they come from the Washington Department of Labor and Industries.
Pacific's code says an application must be signed by the owner of record, or by an agent carrying the owner's verified written authorization, which is how we file on your behalf. For project permit applications, the city has 28 days to say whether a submission is complete or to list exactly what is missing. Inspections happen on Wednesdays and Fridays between noon and 2 p.m.; requests go to the city by email and must arrive by 3 p.m. the business day before.
The White River, its levees and the 2009 flood
Pacific grew on the valley floor of the White/Stuck River, which the comprehensive plan puts at an average of about 70 feet above sea level, and the city incorporated in 1909. In January 2009 the river flooded along its right bank and hit the White River Estates neighborhood, homes along 3rd and 4th Avenues and Pacific Park, according to the King County Flood Control District. Temporary HESCO barriers went up after that flood, and across the channel the Countyline Levee Setback, finished in 2017, reconnected 1.3 miles of the lower White River to its historical floodplain.
The adopted 2020 flood maps govern a remodel. The plan also notes that the river's flood fringe is Pacific's main aquifer recharge area.
Soils, slopes and Mount Rainier
Pacific's comprehensive plan is direct about the ground. A lahar from Mount Rainier covered the Pacific area roughly 500 years ago, and citing a U.S. Geological Survey study, the plan says the city has one of the highest shares of population and assets in the mountain's lahar zone. It also lists river bottom soils prone to liquefaction and glacial till on the steep slopes among the reasons the city carries significant seismic hazard.
The municipal code defines seismic hazard areas as land where loose or soft saturated soils over a shallow water table can settle or liquefy in an earthquake. For a foundation, an addition or an ADU, that is a question for the structural design and the soils information the city may ask for, so it is answered before the drawings are final.
ADUs under PMC 20.92
Pacific amended its accessory dwelling unit chapter in 2025. An ADU is allowed in the RS residential zones on the same lot as a larger principal house, attached to it or detached, and may have up to 1,000 square feet and a height of 25 feet. It has to keep the look of the house, matching its color, roof pitch, siding and windows.
Parking is the detail owners miss: an ADU on a lot of 6,000 square feet or less needs one off-street space, and a larger lot needs two, on top of the spaces the house already requires. The application calls for scaled plans, elevations of both units, and any water courses, wetlands or rockeries on the lot, and utility connection charges are counted per dwelling unit.
What Pacific houses are like
The median Pacific home was built in 1987, according to the Census Bureau's 2020 to 2024 American Community Survey, and the 2000s were the busiest decade, with nearly a quarter of today's homes. A little over one in five predates 1970, much of it in the historic town site north of the county line, which the plan describes as mainly single-family.
About 63 percent of Pacific's homes are detached houses, and a little under six in ten occupied homes are lived in by their owners. A house from the 1980s or 1990s usually needs its kitchen, bathrooms and finishes updated together, and we price that scope line by line in writing before anything starts.
Permits: City of Pacific Building and Permit Center pages, checked September 2026, and PMC 16.20. Flood hazard areas: PMC 23.40. Shorelines: City of Pacific Shoreline Master Program, effective October 30, 2019. Slopes and seismic hazards: PMC 23.50 and the Pacific Comprehensive Plan, Natural Environment element. White River: King County Flood Control District and the Pacific Right Bank Flood Protection Project draft EIS (October 2024). ADUs: PMC 20.92. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates.
Questions Pacific homeowners ask about remodeling
Who issues building permits in Pacific, WA?
The City of Pacific does, for homes in both its King County and Pierce County parts. Building, mechanical and plumbing applications go through the city's SmartGov portal, electrical permits come from the state Department of Labor and Industries, and fire permits go through the Valley Regional Fire Authority.
What should I ask a Pacific remodeling contractor before hiring?
Ask for an active Washington contractor registration, which Labor and Industries lets you look up, and ask who prepares the drawings and files them with the city. Ours is VOLCABI792C6; we prepare the drawings, submit the application through SmartGov and give you an itemized, written price before work starts.
My house is near the White River. Will a remodel trigger the flood rules?
It can. If the work costs 50 percent or more of the house's market value, Pacific treats it as a substantial improvement, and the lowest floor, basement included, must sit at least one foot above the base flood elevation. A development permit is also needed for any construction in a mapped flood hazard area, so we check the maps first.
Can I build an ADU in Pacific?
Yes, in the RS residential zones. Under PMC 20.92 an ADU, attached or detached, may have up to 1,000 square feet and stand 25 feet tall, must match the house's color, roof pitch, siding and windows, and needs one or two extra parking spaces depending on whether the lot is larger than 6,000 square feet.
When does the city inspect the work?
Pacific schedules inspections on Wednesdays and Fridays between noon and 2 p.m. A request goes to the city by email, with the permit number, address and inspection type, by 3 p.m. the business day before, and we plan each stage of the job around those two days.
What does a remodel in Pacific cost?
Scope sets the price: moving plumbing or walls costs more than updating a room in place, and flood or shoreline review adds steps to some projects. You get a written, itemized price before anything begins, and typical ranges by project type are in our Remodeling Pricing Guide.
Pacific neighborhoods we serve
- West Hill
Nearby cities














