Cost of a Kitchen Remodel in the Greater Seattle Area
Kitchen remodels we build across the Greater Seattle Area start at $35,000+ for a refresh and $60,000+ for a new small kitchen. A full mid-range remodel of a medium kitchen starts at $110,000+, and custom open kitchens run to $300,000+.
Prices set by Bar Unger, owner of Volcano Builders, Inc. WA contractor license VOLCABI792C6. Updated October 2026.
Transparent pricing
Kitchen Remodel Pricing by Size and Finish Level
Price depends on three things: the size of the room, whether the layout changes, and the finish level. Pick your kitchen size to see a typical layout, what each finish level includes, and real projects we completed at that size.
Kitchen Refresh
Cabinet boxes and layout stay
Typical size: Any size · cabinets and plumbing stay where they are
Common layouts: New surfaces, finishes and lighting on the existing layout
Typical timeline: 2 to 5 weeks on site, after design and permits
Basic
Functional + affordable
Starting at
$35,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- New quartz counters
- Tile backsplash
- New sink, faucet and disposal
- Painted cabinets with new hardware
- Recessed and under cabinet lighting
- Paint walls and ceiling
Best for: A fresh look without new cabinets
Mid-Range
Style + durability
Starting at
$50,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Everything in Basic
- New cabinet doors and drawer fronts
- Mid level quartz
- New LVP or tile floor in the kitchen
- Upgraded fixtures
- Electrical updates
Luxury
Design + premium finish
Starting at
$75,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Quartzite or premium quartz
- New floor into the dining or living area
- Lighting plan with dimmers
- Premium fixtures
- Pantry and storage upgrades
- Design selections with our designer
Appliances: purchase and installation are not included. We prepare the electrical, plumbing, gas and venting connections for your appliances.
Not included in starting prices: Permit fees · Appliance purchase and installation · Rot, water damage or old wiring found at demo · Decorative light fixtures · Material upgrades beyond the allowance · New cabinet boxes or layout changes. We price these in writing if your project needs them.
Real kitchens we completed at this size
Past project prices from the year each kitchen was completed. Material and labor costs have risen since, which is why the starting prices above are higher.
Small and Galley Kitchens
Galley, L shape and condo kitchens
Typical size: 70 to 120 sq ft · galley, L shape, condo
Common layouts: Galley with two runs · L shape · Condo kitchen
Typical timeline: 6 to 10 weeks on site, after design and permits
Basic
Functional + affordable
Starting at
$60,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Same layout, everything new
- Semi-custom shaker cabinets
- Quartz counters
- Tile backsplash
- New kitchen floor
- Recessed and under cabinet lighting
Best for: New kitchen in the same footprint
Mid-Range
Style + durability
Starting at
$85,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Cabinet layout changes within the room
- Pantry and storage inserts
- Mid level quartz or quartzite
- Sink or range moved
- Upgraded sink and faucet
- Lighting plan
Luxury
Design + premium finish
Starting at
$120,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Custom cabinetry
- Quartzite or stone counters
- Stone or mosaic backsplash
- Wall opened to dining or living
- Hardwood or premium floor
- Full design package with drawings and selections
Appliances: purchase and installation are not included. We prepare the electrical, plumbing, gas and venting connections for your appliances.
Not included in starting prices: Permit fees · Appliance purchase and installation · Rot, water damage or old wiring found at demo · Decorative light fixtures · Material upgrades beyond the allowance · Structural changes and engineering. We price these in writing if your project needs them.
Real kitchens we completed at this size
White Shaker Kitchen and Laundry Remodel in Burien, WAAbout $50,000 · Completed 2022
Navy and White Shaker Kitchen Remodel in Lynnwood, WAAbout $50,000 · Completed 2024
White Shaker Kitchen with Herringbone Floor in Edmonds, WAAbout $50,000 · Completed 2021
Past project prices from the year each kitchen was completed. Material and labor costs have risen since, which is why the starting prices above are higher.
Medium Kitchens
Full kitchen remodel
Typical size: 120 to 200 sq ft · L, U or peninsula
Common layouts: U shape · L shape with peninsula · Small island
Typical timeline: 8 to 12 weeks on site, after design and permits
Basic
Functional + affordable
Starting at
$85,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Same layout, everything new
- Semi-custom cabinets to the ceiling
- Quartz counters
- Tile backsplash
- New floor in the kitchen
- Recessed and under cabinet lighting
Mid-Range
Style + durability
Starting at
$110,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Cabinet layout changes
- Peninsula or island
- Mid level quartz or quartzite
- Patterned backsplash
- Lighting plan
- Upgraded fixtures
Luxury
Design + premium finish
Starting at
$160,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Custom overlay or inset cabinets
- Quartzite or natural stone
- Sink or range moved
- Hardwood floor
- Pot filler and premium fixtures
- Full design package with drawings and selections
Appliances: purchase and installation are not included. We prepare the electrical, plumbing, gas and venting connections for your appliances.
Not included in starting prices: Permit fees · Appliance purchase and installation · Rot, water damage or old wiring found at demo · Decorative light fixtures · Material upgrades beyond the allowance · Structural changes and engineering. We price these in writing if your project needs them.
Real kitchens we completed at this size
White Kitchen with Laundry Nook in Shoreline, WAAbout $70,000 · Completed 2022
White Kitchen with Bay Window Seat in Snohomish, WAAbout $60,000
Past project prices from the year each kitchen was completed. Material and labor costs have risen since, which is why the starting prices above are higher.
Large and Open Kitchens
Open concept with island
Typical size: Over 200 sq ft · island, wall opened to living
Common layouts: L shape with island · Open to living or dining · Walk-in pantry
Typical timeline: 10 to 16 weeks on site, after design and permits
Basic
Functional + affordable
Starting at
$120,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Layout mostly the same
- Island or peninsula
- Semi-custom cabinets
- Quartz counters
- Tile backsplash
- Lighting plan
Mid-Range
Style + durability
Starting at
$160,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Wall opened to living or dining
- New island with seating
- Custom overlay cabinets
- Quartzite counters
- Floor into adjoining rooms
- Designer lighting
Luxury
Design + premium finish
Starting at
$225,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Load-bearing wall removed with engineering
- Custom inset cabinetry
- Slab stone with waterfall end
- Pot filler and premium fixtures
- Panel-ready appliance prep
- Full design package with drawings and selections
Super-Luxury
No limits
Starting at
$300,000+
Includes a standard material allowance. Upgrades are priced from your selections.
- Full re-layout or structural changes
- Full custom millwork
- Book-matched slab stone
- Smart lighting controls
- Butler pantry or scullery
- Dedicated design and project management
Appliances: purchase and installation are not included. We prepare the electrical, plumbing, gas and venting connections for your appliances.
Not included in starting prices: Permit fees · Appliance purchase and installation · Rot, water damage or old wiring found at demo · Decorative light fixtures · Material upgrades beyond the allowance · Load-bearing wall removal on Basic and Mid-Range. We price these in writing if your project needs them.
Real kitchens we completed at this size
Condo Kitchen and Wood Floor Remodel in Seattle, WAAbout $90,000 · Completed 2023
Log Home Kitchen with Waterfall IslandAbout $85,000 · Completed 2022
Past project prices from the year each kitchen was completed. Material and labor costs have risen since, which is why the starting prices above are higher.
Get a Price for Your Kitchen
Book a consultation. We walk the room with you and price it in writing.
What Our Clients Say
Overall, we had a great time with Volcano Builders. There were a few small delays, but they were clear in their communication and kept things moving. The last kitchen remodel turned out great, and the quality seems like it will last for a long time.
I had a great time with Volcano Builders.The team was professional and on time, and the kitchen turned out just how we wanted it.
Gad an amazing experience with Volcano Builders on my kitchen project. Bar my project manager was friendly. He make sure to keep me updated during the whole project. Also is team is very nice.
Read more of our Google reviews, word for word, with video reviews from finished homes.
What sets the price
The 3 Things That Control Price
More linear feet of cabinets and counters means more material, more labor and more time.
Keeping the sink, range and walls where they are saves serious money.
Most of the difference between Basic and Luxury is cabinet grade, counter stone and lighting.
Watch for
What Can Raise the Cost
- Moving the sink, range or gas lineNew drain, supply, gas and venting runs mean opening floors and walls.
- Removing a wallA non-structural wall is a simpler job. A load-bearing wall needs a beam, engineering and a building permit.
- What we find behind the wallsOld wiring, galvanized pipe or water damage show up at demo in older homes. We price repairs before we fix them.
- Custom cabinetryCustom and inset cabinets cost more and add 8 to 12 weeks of lead time.
- Slab stone and waterfall endsQuartzite and natural stone slabs, mitered edges and waterfall ends add material and fabrication time.
- Electrical service upgradesInduction cooktops, pro ranges and more circuits can need a larger electrical panel.
What's Included by Tier
| Feature | Basic | Mid-Range | Luxury | Super-Luxury |
|---|---|---|---|---|
| Demo and disposal | Included | Included | Included | Included |
| Design and layout planning | Basic | Included | Full design | Full design |
| Permits and inspections | As required | As required | As required | As required |
| Cabinets | Semi-custom | Semi-custom or custom overlay | Custom overlay or inset | Full custom millwork |
| Counters | Quartz | Mid level quartz or quartzite | Quartzite or natural stone | Book-matched slab |
| Backsplash | Tile | Patterned tile | Stone or mosaic | Custom stonework |
| Flooring | Kitchen only | Kitchen only | Kitchen and adjoining rooms | Kitchen and adjoining rooms |
| Lighting | Recessed and under cabinet | Lighting plan | Designer lighting | Smart lighting controls |
| Moving sink, range or gas | Not included | Included | Included | Included |
| Wall removal | Not included | Non-structural | Load-bearing with engineering | Full re-layout |
| Appliance connections | Included | Included | Included | Included |
| Appliance purchase and installation | Not included | Not included | Not included | Not included |
"Starting at" prices reflect typical completed projects in the Greater Seattle Area and are not a quote. Final pricing depends on size, layout changes, material selections, permits and what we find behind the walls. Every project is priced in writing after a site visit.
2-year workmanship warranty
Every kitchen we build carries a 2-year workmanship warranty, extendable to 5 years. Materials carry their manufacturer's warranty. See warranty details
Financing options are available for kitchen remodels.
Prices updated October 2026
Kitchen Remodel Cost Questions
How much does a kitchen remodel cost in the Greater Seattle Area?
A kitchen refresh starts at $35,000+. A small or galley kitchen remodel starts at $60,000+, a medium kitchen at $85,000+ and a large open kitchen at $120,000+. Most clients choose Mid-Range, which starts at $110,000+ for a medium kitchen. Every project is priced in writing after a site visit.
What does a kitchen remodel cost per square foot?
Square footage is a weak guide for kitchens. Cabinets, counters and connections cost about the same in a small room. Use the starting prices by size instead: a 70 to 120 sq ft kitchen starts at $60,000+ and a 120 to 200 sq ft kitchen at $85,000+.
Can I remodel a kitchen for $40,000?
Yes, as a Refresh. A refresh keeps your cabinet boxes and layout and starts at $35,000+. New cabinets start at $60,000+ for a small kitchen.
Are appliances included?
No. Appliance purchase and installation are not included in any tier. We prepare the electrical, plumbing, gas and venting connections, so your appliances are ready to install.
Are cabinets and materials included?
Yes. Every tier includes a standard allowance for cabinets, counters, backsplash, flooring and fixtures. Upgrades beyond the allowance are priced from your selections.
What is the most expensive part of a kitchen remodel?
Cabinets and the labor to install them. They are usually the largest single line, followed by counters and any wall or plumbing moves.
How much does it cost to open a kitchen to the living room?
Opening a non-structural wall is included from Mid-Range on Large kitchens. Removing a load-bearing wall needs a beam, engineering and a permit, and starts at our Large Luxury tier.
Does a kitchen remodel need a permit in Seattle or Bellevue?
Usually yes when plumbing, electrical, gas or walls change. Seattle permits go through SDCI, Bellevue through the City of Bellevue. We handle the permits.
How long does a kitchen remodel take?
On site: a refresh takes 2 to 5 weeks, a small kitchen 6 to 10 weeks, a medium kitchen 8 to 12 weeks and a large kitchen 10 to 16 weeks. Design, selections and permits come before that.
How can I keep the cost down?
Keep the sink and range where they are, choose semi-custom cabinets and finalize selections before demo.
What warranty do you give?
Every kitchen carries a 2-year workmanship warranty, extendable to 5 years. Materials carry their manufacturer's warranty.
