Spanaway Home Remodeling Contractors | Volcano Builders Skip to content

Home Remodeling Contractors in Spanaway, WA

Kitchens, baths, decks, additions and ADUs for Spanaway homes, planned around the Pierce County permit, the Spanaway Lake shoreline and the groundwater under the prairie.

  • Your plan set and the Pierce County application are put together by our team.
  • You sign off on a written, itemized price before a single wall is opened.
  • The same project manager stays with your job from the first visit to the last inspection.

By appointment. Limited start dates.

  • Over 200 projects
  • 4.9 on Google
  • 20+ years building
  • WA license VOLCABI792C6
Black floating vanity under a lit mirror cabinet on a blue wall, from an Everett bathroom remodel by Volcano Builders
Bathroom remodel, Everett, WA
Local knowledge

Three Spanaway conditions we plan for first

  1. The Spanaway rule

    Spanaway Lake and its creek are shoreline

    Pierce County's shoreline code takes in the whole of Spanaway Lake, a 272 acre kettle lake, together with the wetlands south of Spanaway Loop Road S, and Spanaway Creek from the lake down to Clover Creek. The standard buffer is measured from the ordinary high water mark and set by the mapped designation: 150 feet for Natural, 100 feet for Conservancy and 75 feet for Residential. More than 170 single-family homes and 160 multi-family residences sit directly on the lakeshore.

    What we do

    We look up your lot on the county's shoreline designation map before a deck, addition or ADU is sketched.

  2. The Spanaway rule

    Groundwater that rises after wet years

    The county's Parkland-Spanaway-Midland Communities Plan says flooding from a high water table is common in Parkland and Spanaway: the porous soils soak up most rain, and in years of heavy cumulative rainfall the shallow aquifer climbs. The plan notes these areas are generally not shown on FEMA flood maps, and it describes an infiltration drainage system that worked while groundwater was low but ran in reverse when it was high, flooding roads, driveways and crawl spaces.

    What we do

    Before a crawl space, lower level or addition is designed, we check your address on the county's flood hazard and critical areas layers.

  3. The Spanaway rule

    Septic lots start with a county screening

    Nearly 6,000 septic systems sit in the groundwater zone that feeds Spanaway Lake, and in 2025 the county and the Tacoma-Pierce County Health Department extended a septic inspection program into the watershed. Pierce County requires a Level 1 Pre-Application Screening for any property served by a septic system or private well, or showing critical area indicators, and the county warns that approval of a new septic system can add significant time.

    What we do

    Any screening and septic review your lot needs is built into the schedule before the building permit is filed.

All three are answered for your parcel while the plans are drawn, ahead of the Pierce County submittal.

Reviews

What homeowners say about working with us

4.9 on Google See our Google profile
Cassidy SchukarGoogle review, March 2025
★★★★★

I had an amazing experience with Volcano Builders! Bar was incredibly kind, communicative, and made the whole process smooth. We completely redid the bathroom,new flooring, vanity, tub, and wall tiles, and it turned out fantastic. I'm so happy with their work that I'm already planning my second bathroom and hopefully the kitchen too. Highly recommend them to anyone looking for quality work and great service!

Winnie CGoogle review, February 2024
★★★★★

Gad an amazing experience with Volcano Builders on my kitchen project. Bar my project manager was friendly. He make sure to keep me updated during the whole project. Also is team is very nice.

L UGoogle review, January 2025
★★★★★

I recently hired Bar from Volcano Builders to remodel my bathroom. Overall, the experience was satisfactory. Bar was professional and communicated well throughout the project. The work was completed on time and within budget. The quality of the remodel met my expectations, though there were a few minor details that could have been improved. I would recommend Bar for anyone looking for a reliable contractor for bathroom renovations.

Subir PrasadGoogle review, November 2024
★★★★★

Had a great experience working with Volcano Builders on remodeling bathroom and flooring in my condo! Bar and his team were very professional from estimates to timely completion of the job! Highly recommend!

Filip PasichnykGoogle review, April 2024
★★★★★

Bar's team completely transformed my outdated Seattle bathroom with their exceptional work. Their communication was excellent, keeping me informed every step of the way. The quality of their workmanship exceeded my expectations, turning my old bathroom into what I wanted. I highly recommend Bar and his team for any remodeling project; they're professional, efficient, and produce outstanding results.

Tom PfizenmaierGoogle review, July 2025
★★★★★

Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.

Homeowners on camera

  • Mark

  • Yoshio Inoue

  • Stephanie

  • Linda, Part 1

  • Clinton & Joan

  • Mr. Will

  • Teresa

  • Linda, Part 2

  • Michelle

  • Sarah & Robert

  • Clifford Harris

  • Rebecca

  • Mrs. Sergeant

  • Paul & Burley

Bar Unger, founder of Volcano Builders

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue, a short drive from Spanaway. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.

Bar UngerFounder, Volcano Builders

Read our story

Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955

Services

Remodeling services in Spanaway

Deck Building

Decks and patios for Spanaway yards and lake lots; the county exempts a deck no more than 30 inches above grade, with shoreline lots checked first.

Process

How your Spanaway remodel works

Three steps, one team, and a written price before anyone picks up a tool.

  1. Consultation

    We visit your home, walk the space and talk through your goals and budget.

  2. Design and permits

    We design the project, price it in writing and handle the Pierce County building permit.

  3. Build and hand over

    One project manager runs the build through the final walkthrough.

Guide

Remodeling in unincorporated Spanaway: county permits, the lake, the aquifer and ADUs

Who permits a Spanaway remodel

Spanaway has no city government, so Pierce County Planning and Public Works is the building department. Applications go in online through the county's PALS+ permit portal, and the county's Online Development Guide lets anyone search an address for its zoning, site constraints and the permits a project is likely to need.

After a complete application is accepted, a permit technician emails an invoice. If it is not paid within five days the application is cancelled. Reviewers then post any corrections as "request" comments in the portal, and the stamped permit set is emailed back once approved. Electrical work is permitted separately by the state Department of Labor and Industries or Tacoma Public Utilities, while plumbing and mechanical permits for fixture swaps are issued by the county as soon as they are paid.

The county's critical areas code exempts interior and exterior remodeling that does not enlarge the footprint or raise the roof, unless the house is in a flood hazard or active landslide area. A single expansion of up to 25 percent can also qualify when it moves away from the protected area and costs no significant trees. The county asks that the exemption be confirmed first, with a written project description and a site plan.

Building near Spanaway Lake

Spanaway Lake formed where a buried block of glacial ice melted. It covers 272 acres, averages about 16 feet deep and reaches about 28, and groundwater supplies roughly 65 percent of its water. Coffee Creek enters at the south end from a wetland on Joint Base Lewis-McChord, and the lake drains north into Spanaway Creek. The county park on the northeast shore draws about 500,000 visits a year.

Owners along the shore also belong to Spanaway Lake Management District No. 1, which the County Council created in 2021 as the first district of its kind in unincorporated Pierce County. It carries an annual charge on the parcels inside it and funds weed control, algae work and water quality monitoring on the lake.

Inside shoreline jurisdiction, a legally built house can still grow without a shoreline variance: on the landward side where the existing building already shields the water, in line with the house over existing hard surfaces with no vegetation lost, or straight up within the height limits. On a residential lot no more than a third of the ground within jurisdiction may be covered by effective impervious surface, not counting a 12 foot driveway. A standard buffer can be averaged, or in the Residential and Conservancy designations reduced, by up to 25 percent when the code's tests are met, and an unpaved path to the water may be four feet wide if no trees come down.

Prairie soil, the aquifer and pocket gophers

The county plan describes Spanaway as sitting on Spanaway gravelly sandy loam, a glacial outwash soil mixed with volcanic ash that drains fast and turns dry by late summer. It once carried prairie and oak savannah, and it lets roughly half or more of the rain soak down to the groundwater.

That groundwater is the Clover/Chambers Creek Aquifer, part of the Central Pierce County Sole Source Aquifer, and county code treats both as aquifer recharge areas. The plan puts more than half of the Parkland-Spanaway-Midland area inside a wellhead protection area. The aquifer chapter's design standards are aimed at subdivisions, buildings of three or more units, commercial sites and hazardous uses.

The same soil matters for the Mazama pocket gopher, a protected species. The state Department of Fish and Wildlife lists Spanaway gravelly sandy loam among the soils where the gopher is most often found and recommends a mound survey between June and October on those soils. Pierce County code refers to a habitat assessment for the gopher and lets the county waive it where the location, nearby development, existing structures or project size show the animal is likely absent.

ADUs inside the Urban Growth Area

Spanaway lies in the county's central Urban Growth Area, where Pierce County allows two accessory dwelling units on a lot with a single-family house, attached, detached or one of each. Each may have up to 1,000 square feet of interior habitable space, counting a basement or attic but not a garage, and ADUs are left out of density counts.

A new detached unit stays out of the required setbacks and no taller than the main house, with two allowances: one extra story above a detached garage, and a floor of 24 feet unless the house itself is capped lower. Within the Urban Growth Area, the side and rear setbacks for an ADU may drop to five feet, or to two feet at the rear where the lot backs onto an alley, and an existing detached building can be converted to an ADU inside a side or rear setback.

The owner applies for a building permit showing the size and design limits are met, and street improvements cannot be made a condition of approval. A lot within half a mile of a major transit stop needs no extra parking space for its ADUs; farther out, the county's parking chapter applies.

Spanaway houses and how they grew

Spanaway was one of the earliest settled places in Pierce County, with records back to the late 1840s, and Military Road South is a remnant of the territory's first military road, built in 1853. In the early 1890s the community was the southern end of the Tacoma and Columbia Railroad, with a three-story, 72 room Hotel Spanaway near the depot, and Spanaway Park was founded in 1903. The old town site lies south of the park on the lake's eastern shore.

Growth came later. The county plan credits the extension of sanitary sewer in the mid-1970s with shaping residential building, and the Census Bureau's 2020 to 2024 American Community Survey counts about 34,000 residents and 12,000 homes. The median home was built in 1989 and about 37 percent date from 2000 or later, while the 1970s added about one in five. Roughly 78 percent are detached houses and about three in four occupied homes are owner occupied.

That mix means many Spanaway remodels start in a house from the 1970s through the 1990s, where kitchens, baths, windows and insulation are due at about the same time. We price each of those line by line, in writing, before anything starts.

Permits: Pierce County Planning and Public Works Residential page, Residential Construction Customer Guide (September 2026) and Work Exempt from Building Permit guide (May 2024). Critical areas and aquifers: Pierce County Code Title 18E. Shorelines: Pierce County Code Title 18S. ADUs: PCC 18A.37.120 (December 2025). Lake: Spanaway Lake Management Plan (2016) and Spanaway Lake Management District records (2021 to 2025). Soils, groundwater flooding and history: Parkland-Spanaway-Midland Communities Plan, Pierce County Comprehensive Plan Appendix I. Pocket gopher: Washington Department of Fish and Wildlife management recommendations. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates, Spanaway CDP.

Questions

Spanaway remodeling questions

Does Spanaway have its own building department?

No. Spanaway is unincorporated, so Pierce County Planning and Public Works issues permits for remodels, additions and ADUs, filed online through PALS+. Electrical permits come from the state Department of Labor and Industries or Tacoma Public Utilities, and septic work is reviewed by the Tacoma-Pierce County Health Department.

Do I need a permit for new kitchen cabinets and countertops?

Not for those alone. Pierce County lists cabinets, countertops, painting and tile as finish work that needs no building permit. Moving a wall, adding plumbing or changing the layout does need one, and new wiring is permitted through the state or Tacoma Public Utilities.

Is my lot on Spanaway Lake under shoreline rules?

Very likely. County shoreline jurisdiction covers the whole lake, the wetlands south of Spanaway Loop Road S and Spanaway Creek, with standard buffers of 75 to 150 feet depending on the mapped designation. We check your lot's designation before design.

Can I build two ADUs on a Spanaway lot?

Spanaway is inside the Urban Growth Area, where Pierce County allows two ADUs with a single-family house, attached or detached, each up to 1,000 square feet of habitable space. Side and rear setbacks for an ADU may be reduced to five feet.

Why does my house on septic need a pre-application screening?

Pierce County requires a Level 1 Pre-Application Screening for properties on a septic system or private well, or with critical area indicators, before the building permit.

What does a remodel in Spanaway cost?

It depends on the scope and the site: moved plumbing, a septic review or shoreline work each add steps. You get a written, itemized price before work starts, and typical ranges by project type are in our Remodeling Pricing Guide.

Service area

Serving Spanaway

Volcano Builders 1750 112th Ave NE #B217 Bellevue, WA 98004 (206) 666-0412 Get directions

Nearby cities

Map of the Spanaway census-designated place
Census-designated place boundary (statistical, not a legal limit), land and water: U.S. Census Bureau.
Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your Spanaway consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?