Home Remodeling Contractors in University Place, WA
Kitchens, bathrooms, additions, decks and ADUs for University Place homes, from the Day Island waterway and the Sunset Beach shore to the streets above Chambers Creek Canyon.
- Complete permit sets prepared for the city's Planning and Development Services desk.
- A written, itemized price you approve before any demolition.
- One project manager who stays on your job from design to final inspection.
By appointment. Limited start dates.
- Over 200 projects
- 4.9 on Google
- 20+ years building
- WA license VOLCABI792C6
Three University Place rules that shape a remodel
-
The University Place rule
Setbacks measured from the tide line
The city's Shoreline Master Program covers about 5.9 miles of Puget Sound shore and 2.65 miles of Chambers Creek, plus the land within 200 feet of them. New homes and additions must stand back from the ordinary high water mark by 35 feet on Day Island, 5 feet at Sunset Beach and on the Day Island South Spit, and 125 feet on the Urban Conservancy shore along the Sound and in Chambers Creek Canyon. An older house that already sits closer counts as conforming, but on the South Spit an addition cannot take the home past 1,600 square feet, garage included.
What we doBefore an addition or a waterfront deck is drawn, we look up which shoreline environment and setback apply to your parcel.
-
The University Place rule
A geotechnical report near the bluffs
Under chapter 17.15 of the city code, a slope of 40 percent with 10 feet of rise, or a slope over 15 percent where porous soil sits on a tight layer and water seeps out, is a landslide hazard area. Work inside one needs a geotechnical report unless a geological assessment shows it stays outside. Slopes with 10 feet or more of relief also carry a buffer at the top and the toe, and any new hard surface over 120 square feet must sit a further 8 feet back from that buffer.
What we doWe check your address on the hazard maps the code relies on before design, so the need for a report is known at the start.
-
The University Place rule
Three permit desks for one house
University Place issues building, plumbing and mechanical permits, which are sent to the city by email. Electrical and water permits come from Tacoma Public Utilities and sewer permits from Pierce County, and any sewer permit a project needs must be issued before the city releases the building permit. Every contractor also needs a Washington license and a City of University Place business license.
What we doWe prepare the drawings and file each permit with the office that issues it, starting with the county sewer permit when the job needs one.
We work through all three for your address while the design is still on paper.
What homeowners say about working with us
I had an amazing experience with Volcano Builders! Bar was incredibly kind, communicative, and made the whole process smooth. We completely redid the bathroom,new flooring, vanity, tub, and wall tiles, and it turned out fantastic. I'm so happy with their work that I'm already planning my second bathroom and hopefully the kitchen too. Highly recommend them to anyone looking for quality work and great service!
I just got my bathroom redone by Volcano, and Wow im in love With the final look! Bar was very communicative. Its feel like he was there with me every step of my way, making sure i was kept in the loop. His team was super friendly and professional. They made tge tge process smooth. My new bathroom is everything i hoped for and more. Thank you Volcano!
Bar and the team at Volcano Builders did a great job! Professional service, great communication throughout the whole process, and everything was done with care and attention to detail. Highly recommend!
I had a great time with Volcano Builders.The team was professional and on time, and the kitchen turned out just how we wanted it.
Volcano did a master bath remodel for us. The project was completed efficiently and on time. All of their workman were courteous and hard working. When we had a couple of material delivery delays they kindly adjusted their schedules. Their pricing was fine and the terms of the contract were fulfilled. We highly recommend Volcano Building.
Volcano builders did a phenomenal job on my bathroom remodel. They exceeded my expectations on many levels. Their designer helped me pick out all the tile and bathroom accessories to make sure everything matched in style. Communication was great and response time very fast whenever I had questions for them. They estimated the project would take 5-6 weeks but finished in 4 weeks! Excellent job! Loooooove my new bathroom! Including pics of the Before… and the After!
Homeowners on camera
-
Mark
-
Yoshio Inoue
-
Stephanie
-
Linda, Part 1
-
Clinton & Joan
-
Mr. Will
-
Teresa
-
Linda, Part 2
-
Michelle
-
Sarah & Robert
-
Clifford Harris
-
Rebecca
-
Mrs. Sergeant
-
Paul & Burley

I'm Bar, founder of Volcano Builders. I have been building for 20+ years, and our main office is in Bellevue, a short drive from University Place. Most remodeling problems start before any work does: a vague price, a missed permit step, nobody answering the phone. So every project we take on gets a written, itemized price before work starts, a design and permit plan built around your city's rules, and one project manager you can actually reach.
Bar UngerFounder, Volcano Builders
Licensed, bonded and insured · CC VOLCABI792C6 · UBI 604-700-955
Remodeling services in University Place
Bathroom Remodeling
Primary and guest bathrooms, from tile and fixtures to new plumbing and waterproofing.
Kitchen Remodeling
Kitchen remodels for University Place houses from the 1950s to the early 1980s, with the electrical permit issued by Tacoma Public Utilities.
Basement Remodeling
Finished living space, a guest suite or a media room below the main floor.
Deck Building
Decks and covered patios framed for the city's 25 pound snow load and the stronger wind exposure mapped on some lots facing the Sound.
ADU and DADU
University Place allows up to two ADUs with a detached house, each up to 1,000 square feet, with a notice recorded on the title before the permit issues.
Home Additions
Extra bedrooms, bathrooms or living space, designed to match the existing house.
Whole Home Renovation
Several rooms or the whole house, planned and built as one project.
Siding
Siding repair, replacement and installation, with the barrier and flashing behind it done first.
Window Replacement
Replacement windows measured, ordered and installed, sized for egress, safety glass and energy rules.
Foundation Repair
Crack repair, drainage, basement waterproofing and seismic retrofits, engineered where the city requires it.
How your University Place remodel works
Three steps, one team, and a written price before anyone picks up a tool.
-
Consultation
We visit your home, walk the space and talk through your goals and budget.
-
Design and permits
We design the project, price it in writing and handle the City of University Place building permit.
-
Build and hand over
One project manager runs the build through the final walkthrough.
Working with a general contractor in University Place: permits, shoreline, slopes and ADUs
How permits work in University Place
The city asks for a permit whenever a building is built, enlarged, altered, repaired or demolished, and whenever an electrical, gas, mechanical or plumbing system is installed, altered or replaced. That covers most kitchen and bathroom remodels. Applications and permit documents go to Planning and Development Services by email, and the department encourages sending preliminary plans early so code conflicts surface before the full set is drawn. For larger projects it holds a weekly Technical Review Committee meeting.
A residential submittal usually includes the application, a scaled site plan showing property lines, easements, existing and proposed structures and street frontages, construction drawings and, where the design calls for them, engineered drawings, calculations and a geotechnical report. A project that creates more than 2,000 square feet of new hard surface also needs small project drainage review, and any change after submittal goes in with a building revision form.
Inspections for building, plumbing and mechanical work are requested by phone or email; a request made before 3 p.m. is scheduled for the next business day. The approved plans and inspection card must be on site and the address posted, or the inspection is not performed. Electrical inspections are booked with Tacoma Power and sewer inspections with Pierce County. The city does not publish plan review times on these pages, so we set your start date once its first review comes back.
Day Island, Sunset Beach and the Chambers Creek shore
University Place adopted its current Shoreline Master Program in March 2015, and the Department of Ecology gave final approval that April; a periodic review was adopted in July 2018. The program sorts the shore into environments. Day Island and Sunset Beach, the two waterfront residential neighborhoods, are Shoreline Residential. The marinas, yacht club and mixed uses along the Day Island waterway are Day Island Medium Intensity. The homes backing onto the railroad right of way along the Sound, the Chambers Creek Properties and Kobayashi Park fall in Urban Conservancy, and most of the Chambers Creek channel is Natural.
Each environment has its own limits. In Shoreline Residential a 25 foot vegetation conservation area runs inland from the high water mark, although Sunset Beach, the South Spit and Day Island homes already built within 10 feet of the water are exempt from restoring it. Day Island lots may cover 35 percent with hard surfaces, or 40 percent with vegetation restored, and Sunset Beach lots 50 or 55 percent on the same terms. Homes may reach 35 feet on Day Island and at Sunset Beach and 30 feet on the South Spit, with accessory buildings held to 15 feet.
Some work inside shoreline jurisdiction can proceed as exempt, but clearing, filling, excavation, docks, shore stabilization and anything in a critical area or its buffer still needs a letter of exemption from the city before it starts.
Bluffs, ravines and glacial soil
The city sits on a rolling plateau that climbs from sea level to about 430 feet, with steep slopes dropping to Puget Sound on the west and into Chambers Creek Canyon on the south. Most of the ground is glacial deposit, including dense till that builders call hard pan, and the city's own plan warns that slopes over 15 percent, where till lies under well drained soil, can fail when water is present.
When a geotechnical report is needed, the code sets what goes in it: a contour map at one inch to 20 feet with slopes split into 15 to 29 percent and 30 percent or more, boring logs, groundwater levels and their seasonal change, the site's history of grading or slides, and setback recommendations. A report written for the same site in the last five years can be reused if nothing has changed. On slopes of 100 percent or steeper, where a porous layer sits over a tight one, no structure or clearing is allowed at all.
The city is in Seismic Design Category D1 for houses built under the residential code. It also gets about 39 inches of rain a year, two thirds of it between October and March, which is why we time excavation and exterior work around the drier months where the schedule allows.
ADUs and backyard cottages
Chapter 19.70 of the city code allows up to two ADUs with a detached house, but only one detached unit on a lot smaller than its zone's minimum lot size. A unit may be attached, a separate cottage or part of an accessory building such as a carriage unit over a garage, and it may not exceed 1,000 square feet. Inside the side or rear setback a detached ADU keeps 5 feet from the side and rear lines and 5 feet from the house, stays at or under 24 feet to the ridge and 10 feet at the top plate, and a carriage unit's ground footprint stays within 600 square feet. Only one detached ADU may use those reduced setbacks.
No off-street parking is required within half a mile walking distance of a major transit stop. Elsewhere the code asks for one space per ADU on lots of 6,000 square feet or less and two on larger lots. Before the building permit issues, the owner records a notice on the title with the Pierce County Auditor.
What University Place houses need
The city's plan traces its housing to the Menlo Park lots of 1889, Sunset Beach, subdivided in 1933, and Soundview Drive in 1939. Building took off in the mid 1950s, the south central and southwestern neighborhoods filled in from the 1950s through the early 1980s, and planned developments followed in the southeast and along Chambers Creek Road in the 1990s and 2000s.
The Census Bureau's 2020 to 2024 American Community Survey puts the median year built at 1981. The 1970s were the busiest single decade, and just under half of all homes predate 1980. About 54 percent are detached single-family houses. A house from those decades can hold original wiring, aging supply lines and thin insulation behind the walls, and we allow for that in the written estimate from the start.
Permits: City of University Place Planning and Development Services, Permit Information, Building Plumbing and Mechanical Permits, Inspection Information and Residential Submittal Requirements, September 2026. Shorelines: University Place Shoreline Master Program (Ecology approved 2015, periodic review 2018), UPMC Title 18. Slopes: UPMC chapter 17.15 and the Comprehensive Plan as amended December 2024. ADUs: UPMC 19.70.010. Housing: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates.
University Place remodeling questions
Do I need a permit to remodel a kitchen in University Place?
Usually, yes. The city requires a permit to alter or repair a building and to install, alter or replace plumbing, gas, mechanical or electrical systems, so moving a sink, adding circuits or changing a vent all count. The electrical permit comes from Tacoma Public Utilities rather than the city.
Can I add on to a house on Day Island?
Often, within limits. Day Island homes in Shoreline Residential have a 35 foot setback from the high water mark, and a house already closer is treated as conforming. It can be expanded when all the new building volume, up or out, stays outside the vegetation conservation area and the setback.
How large can an ADU be in University Place?
Up to 1,000 square feet. Two ADUs are allowed with a detached house, one detached unit if the lot is under the zone's minimum size, and a notice goes on the title with the Pierce County Auditor before the permit is issued.
Will my project need a geotechnical report?
Only if the work falls inside a landslide or erosion hazard area or its buffer. The city waives the report when a geological assessment shows the work stays outside.
How do I choose a general contractor in University Place?
Confirm a current Washington contractor license with Labor and Industries and a City of University Place business license, which the city requires of every contractor working there. Then ask who prepares and files the permit set, and get the price in writing. We handle the permit package and give you an itemized, written price before any work begins.
How much does a bathroom remodel in University Place cost?
It depends on the scope: relocating a shower, toilet or wall costs more than new tile and fixtures in the same places, and a 1970s house may need plumbing or wiring updates once it is opened. You approve a written, itemized price before any work starts. Ranges by project type are in our Remodeling Pricing Guide.
University Place neighborhoods we serve
- Day Island
- Sunset Beach
- Beckonridge
- Westhampton
- Brookridge
- Bristonwood
Nearby cities














