This Redmond master bathroom was designed with us first and then built in about 18 weeks in 2023. Its center is an open walk-in shower with no curb at the glass: a linear drain, a floating bench, two tiled niches and a skylight and window for daylight. Two warm wood shaker vanities with white tops face each other across the room, joined by a full-height linen cabinet and a heated towel rail.

City
Redmond, WA
Service
Master bathroom remodel, design and build
Scope
Interior design, then a full rebuild: walk-in shower with bench and niches, two vanities, linen cabinet, heated towel rail, lighting, tile floor
Duration
About 18 weeks of construction, August 8 to December 14, 2023
Approximate investment
About $75,000
Materials
Light handmade-look wall tile, wood-look floor tile, linear drain, frameless 1/2 inch clear glass panel, wood shaker cabinets with white tops
Contractor
Volcano Builders, WA license VOLCABI792C6

Every project is priced in writing, line by line, for your home.

Two wood shaker vanities on either side of the room with the walk-in shower and skylight between them
Two vanities face each other, with the shower between
After

The finished master bathroom

Master bathroom with an open glass walk-in shower, floating bench and skylight beside a wood shaker vanity
The finished Redmond master bath: open shower, bench and wood vanity
Walk-in shower under a skylight with a window, a floating white bench and a niche in light tile
A skylight and a window light the walk-in shower
Glass shower entry beside a heated towel rail and a white door, with a skylight above
The shower entry, with a heated towel rail on the wall
Two wood shaker vanities on either side of the room with the walk-in shower and skylight between them
Two vanities face each other, with the shower between
Two wood vanities with wall sconces and mirrors facing across the room toward a doorway
Both vanities, looking toward the doorway
Wood shaker vanity with a white top, tall cabinet, sconces and a mirror
One vanity, with a tall cabinet at its end
Wood vanity with an undermount sink, two tall wall sconces and a rounded mirror
Tall sconces on either side of the mirror
Bank of wood shaker drawers and doors with brushed pulls on raised feet
A bank of drawers on raised feet
Full-height wood linen cabinet with two upper doors and three drawers
A full-height linen cabinet in the same wood
Shower wall with a stacked double niche, a handheld shower and a floating bench
A stacked double niche above the floating bench
Close view of a tiled shower niche divided by a white shelf
A shelf divides the tiled niche
Linear drain along the shower wall in wood-look floor tile, with the glass panel at the edge
A linear drain, with no curb at the glass
Brushed steel heated towel rail with a teal towel and a wall switch
The heated towel rail beside the shower
Inside the walk-in shower with a handheld on a bar, a niche, the bench and the glass panel
Inside the shower: handheld, niche and bench
Brushed nickel shower valve trim set in light handmade-look tile
Brushed valve trim on the handmade-look tile

Know someone planning a project like this? Refer them: you get $500 cash or $1,500 credit, they get $500 off.

Video

Before and after video

Two wood shaker vanities facing each other with the walk-in shower and skylight between them, video thumbnail
Before and after video of this Redmond bathroom. 29 seconds.
The project

How this Redmond master bathroom came together

The goal

The plan was a master bathroom built for two: a large walk-in shower that is easy to step into, a separate vanity for each person and enough closed storage that counters could stay clear.

The challenge

An open shower with no curb only works if the floor is pitched to drain correctly and the glass is placed with care, and here it shares the room with two vanities and a door. That called for a settled design before any demolition.

The solution

The project began with our interior design service in spring 2023, and construction started on August 8 once the plan was set. The shower sits under a skylight and a window, finished in light handmade-look tile with a floating white bench, a stacked double niche and a second niche on the side wall, a handheld on a slide bar and brushed nickel trim. A linear drain runs along the wall, so the wood-look floor tile carries straight into the shower, and a single frameless 1/2 inch clear glass panel, made to a drawing and anchored with clips, keeps the spray in. Two wood shaker vanities with white tops and undermount sinks face each other, each with tall sconces and a rounded mirror, and a full-height linen cabinet and a heated towel rail complete the room.

The result

The bathroom was complete on December 14, 2023, about 18 weeks after construction began. The shower floor is continuous with the room, each person has a vanity, and the warm wood against the light tile keeps the room bright without feeling cold.

Keep reading
Questions

Questions about this project

What makes a walk-in shower with no curb work?

A floor pitched to a drain and glass placed to hold the spray. In this Redmond bathroom a linear drain runs along the shower wall, so the floor tile carries straight in, and one frameless 1/2 inch glass panel, made to a drawing, keeps the water in.

Did this bathroom start with a design phase?

Yes. The owners worked with our interior design service from April 2023, and construction began on August 8, once the layout of the shower, vanities and storage was settled.

How much did this project cost?

About $75,000. It took about 18 weeks of construction, from August 8 to December 14, 2023, after the design phase. Every project is priced in writing, line by line, for your home.

How do I get a price for a master bathroom remodel like this one?

Book a consultation. We look at the room, talk through the shower, vanities and storage you want, and send a written, itemized price before work starts. For what moves the price of a bathroom, read Cost of a Bathroom Remodel in the Greater Seattle Area.

Next steps

Before you book

Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your bathroom consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?