Split-Level Whole Home Remodel with a Marble Fireplace

We remodeled this split-level home from the structure out between November 2021 and June 2022. Walls on the main floor were opened with temporary shoring, and the house gained a white kitchen with an island, two new bathrooms, a gray plank floor, fresh paint, a black cable stair railing and a black marble slab fireplace wall where a brick hearth and wood paneling used to be.

Home type
Split-level house
Service
Whole home remodel
Scope
Structural and framing work, kitchen, primary and guest bathrooms, flooring, painting, stair railings, glass, marble fireplace, basement cabinet
Duration
About seven months, November 2021 to June 2022
Approximate investment
About $200,000
Materials
White shaker cabinets, veined white counters, gray plank floor, large-format marble-look tile, black fixtures, black marble slab fireplace, black cable railing
Contractor
Volcano Builders, WA license VOLCABI792C6

Every project is priced in writing, line by line, for your home.

Floor to ceiling black marble slab fireplace wall with a linear fireplace
The black marble slab fireplace that replaced the brick
Before

Before the build

Original kitchen with dark wood cabinets, wall ovens and a speckled floor
Before: the original kitchen with dark wood cabinets and wall ovens
Living room before the remodel, with wood paneled walls and worn blue carpet
Before: wood paneling and blue carpet in the living room
Brick fireplace with a raised hearth set in a wood paneled wall
Before: the brick fireplace and paneled wall
Carpeted stairs between the levels of the split-level home
Before: carpeted stairs between the levels
Original bathroom with a pink tiled shower and framed glass door
Before: a pink tiled shower in one of the original baths
After

The finished home

Floor to ceiling black marble slab fireplace wall with a linear fireplace
The black marble slab fireplace that replaced the brick
Stairs with a black cable railing and a round pendant light at the entry
New stair railing in black cable under a round pendant
Walk-in shower with large-format marble-look tile, black rain head, pebble floor and a lit mirror over the vanity
Primary bath: walk-in shower with a pebble floor
Soaking tub with a tiled niche, black fixtures and large-format marble-look tile
Second bath: soaking tub with a tiled niche
Bedroom with a black accent wall, gray plank floor and recessed lights
A bedroom with a black accent wall and the same floor
The project

How this split-level remodel came together

The goal

The house still had its original finishes: a dark wood kitchen with wall ovens, wood paneling and a brick fireplace in the living room, blue carpet on the stairs and floors, and pink and blue tile in the bathrooms. The goal was to bring every room up to date and open the main floor around a new kitchen.

The challenge

Opening the main floor meant structural work. Walls came out and the ceiling was opened to the joists, so temporary steel posts had to carry the load while new framing went in. A split-level adds its own difficulty, with short flights of stairs tying the levels together that all had to be rebuilt to match.

The solution

The structural and framing work came first, with its own payment milestones, and the kitchen drawings were approved before the kitchen went in. We hung new drywall across the opened floor, then installed white shaker cabinets, an island, veined white counters and a stainless chimney hood. Both bathrooms were rebuilt in large-format marble-look tile with black fixtures: a walk-in shower with a pebble floor in one, a soaking tub with a niche in the other. A gray plank floor and fresh paint went through the house, the stairs got a black cable railing, and the brick fireplace was replaced by a floor to ceiling black marble slab wall.

The result

The kitchen was invoiced complete in January 2022, the bathrooms at the end of January, and the flooring and paint in February. The railings, glass and marble fireplace followed, and the project closed in June 2022. The finished home is bright and consistent from level to level, with one floor, one palette and an open main floor built around the kitchen.

Keep reading

Part of the same project: Soaking Tub Bathroom Remodel with Marble-Look Tile

Questions

Questions about this project

Can walls be removed in a whole home remodel?

Often, yes, with structural work. In this home the walls were opened while temporary steel posts carried the ceiling, and new framing was completed before the drywall and the kitchen went in. That work had its own milestones in the schedule.

How long did this whole home remodel take?

About seven months. The down payment was in November 2021, the kitchen and both bathrooms were finished by the end of January 2022, flooring and paint in February, and the railings, glass and fireplace before the project closed in June 2022.

How much did this project cost?

About $200,000. It took about seven months, from the November 2021 down payment to the June 2022 completion. Every project is priced in writing, line by line, for your home.

How do I get a price for a whole home remodel like this one?

Book a consultation. We walk the house with you, talk through the scope and send a written, itemized price before work starts. For what moves the price, read Remodeling Pricing Guide for Seattle and Bellevue, WA.

Next steps

Before you book

Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your remodeling consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?