Guest Bathroom and Tub Remodel in Seattle, WA

This guest bathroom was the second room in a two-bathroom remodel at one Seattle house in 2022. Its tan wall tile, white penny tile floor and pedestal sink came out, the tub wall was opened, and a new tub and a patterned tile floor went in. The primary bathroom in the same house became a skylit wet room, shown below.

City
Seattle, WA
Service
Guest bathroom remodel, part of a two-bathroom project
Scope
Tan wall tile and penny tile floor removed, tub wall opened, subfloor reframed for drain slope, new tub, patterned tile floor
Year
2022
Permit
Electrical and plumbing permits for the two-bathroom project, 2022
Contractor
Volcano Builders, WA license VOLCABI792C6
Approximate investment
About $50,000

Every project is priced in writing, line by line, for your home.

Finished primary bathroom wet room with a freestanding tub and shower behind glass under a skylight
From the same Seattle project: the finished primary bathroom wet room
Before

The guest bathroom, before

Guest bathroom before the remodel with tan wall tile, a blue shower curtain and a pedestal sink
Before: the Seattle guest bath, tan tile and a pedestal sink
Guest bathroom with a pedestal sink, tub and tan wainscot tile before the remodel
Before: the guest bath in February 2022
Old tub alcove with tan tile walls and a white penny tile floor
Before: the old tub alcove and penny tile floor
After

Finished in the same house

Finished primary bathroom wet room with a freestanding tub and shower behind glass under a skylight
From the same Seattle project: the finished primary bathroom wet room

Know someone planning a project like this? Refer them: you get $500 cash or $1,500 credit, they get $500 off.

Video

This bathroom on video

Video thumbnail: this Seattle guest bathroom
Video of this Seattle guest bathroom. 10 seconds.
The project

How the guest bathroom fit the Seattle project

The goal

The house had two dated bathrooms. The guest bath had tan wall tile to the wainscot line, a white penny tile floor, a tub with a curtain and a pedestal sink. The plan was to bring it up to date in the same project as the primary bath, so both rooms would be opened and closed once.

The challenge

The guest bath is narrow, with the tub across the end wall under the window. Toilets were moving in the project, and the drain slope under the floors did not work for the new positions, so the subfloors in the bathrooms had to be reframed before any tile.

The solution

After demolition in March 2022 the subfloors were reframed under a change order to give the relocated toilets the right drain slope, and new plumbing and wiring went in under electrical and plumbing permits. In the guest bath the tan tile came off, the tub wall was opened, and a new tub was set under the window. A patterned tile floor was laid from the door to the tub.

The result

The guest bath moved from tan tile and a pedestal sink to a new tub and a patterned floor, built alongside the primary bath in the same project. The tile for the house was set by October 2022. We do not have a finished photo of this room, so the after photo here is the primary bathroom from the same project.

Keep reading
Questions

Questions about this project

Is it worth remodeling two bathrooms at the same time?

It can be. In this Seattle house both bathrooms needed the floor framing changed for relocated toilets, so the reframing, plumbing and permits were handled once for both rooms instead of twice.

Why is there no finished photo of this guest bathroom?

We have no photo of this room after the walls were finished. Rather than show a different room as this one, the after photo is labeled as the primary bath from the same project.

When did work on this guest bathroom happen?

The project was agreed in July 2021, and the first photos of this room were taken a few days later. Demolition for both bathrooms started in March 2022, the new tub was set by August 2022, and the tile for the house was finished that October.

How much did this project cost?

About $50,000. Every project is priced in writing, line by line, for your home.

How do I get a price for a guest bathroom remodel like this one?

Book a consultation. We look at each bathroom, talk through what changes, and send a written, itemized price before work starts. Cost drivers for one or two bathrooms are covered in Cost of a Bathroom Remodel in the Greater Seattle Area.

Next steps

Before you book

Volcano Builders team member holding a phone showing the Google Business listing, Built Without Compromise

Book your bathroom consultation

Four quick steps. Tell us about your project and we’ll reach out to discuss it and see if we’re the right fit.

What is your project?