Kitchen Remodel Checklist: 9 Steps in Order
A kitchen remodel checklist is nine steps in this order: set the budget and scope, plan the layout, choose cabinets and counters, pick appliances, plan lighting and electrical, plan plumbing and gas, file permits, set the schedule and plan how you will live without a kitchen. Every choice is made before demolition starts.
Below is each step with our published prices, the Seattle code text and what our own kitchens took. To walk your kitchen with us, Book a Consultation.

What is on a kitchen remodel or renovation checklist, step by step?
Nine decisions, in the order each one depends on the last. The layout sets the cabinets. The cabinets set the counters. The appliances set the cabinet openings, the circuits and the gas and water lines. The permits follow from what moves.
| Step | What you decide | Must be final before |
|---|---|---|
| 1. Budget and scope | Refresh or new kitchen, size band, finish level | Design starts |
| 2. Layout | Whether the sink, range, refrigerator or a wall moves | Cabinets are drawn |
| 3. Cabinets and counters | Cabinet grade and layout, counter stone, backsplash, floor | Cabinets are ordered |
| 4. Appliances | Models, sizes, fuel and hood | Cabinets are ordered (openings, hood and outlets are sized to the models) |
| 5. Lighting and electrical | Recessed, under cabinet and pendant lights, circuits, panel size | Walls are closed |
| 6. Plumbing and gas | Sink, dishwasher and range connections, any moved lines | Walls are closed |
| 7. Permits | Building, electrical, plumbing and gas permits the scope needs | Demolition |
| 8. Schedule | Order dates, start date, on-site weeks | Demolition |
| 9. Living without a kitchen | Temporary kitchen, meals, access for the crew | Demolition |
Order of work as we run it on our kitchen remodels; each step is explained below.
How do you set the budget and scope for a kitchen remodel?
Start with one choice: keep the cabinet boxes and layout, or replace them. Our kitchen pricing guide, updated October 2026, starts a refresh at $35,000+. That keeps the cabinets and plumbing where they are. A new small kitchen of 70 to 120 square feet starts at $60,000+, and a medium kitchen of 120 to 200 square feet at $85,000+. Size, layout changes and finish level set most of the rest.
Our Renton condo kitchen is a refresh. The cabinets, granite and backsplash stayed, and the work went into a new plank floor, paint and electrical. It cost about $35,000 in 2024. The full tiers are in the guide linked under the table.
| Kitchen | Typical size | Basic starts at | Typical on-site timeline |
|---|---|---|---|
| Refresh (cabinet boxes and layout stay) | Any size | $35,000+ | 2 to 5 weeks |
| Small or galley | 70 to 120 sq ft | $60,000+ | 6 to 10 weeks |
| Medium | 120 to 200 sq ft | $85,000+ | 8 to 12 weeks |
| Large and open | Over 200 sq ft | $120,000+ | 10 to 16 weeks |
Source: our kitchen pricing guide, updated October 2026. Prices include a standard material allowance. Timelines are on site, after design and permits. Not a quote; every kitchen is priced in writing after a site visit.

How do you plan the kitchen layout before anything is ordered?
Decide what moves first. Keeping the sink, range and walls where they are costs the least, per our pricing guide. Moving them means new drain, supply, gas and venting runs through opened floors and walls. A wall that comes out is a bigger step: a load-bearing wall needs a beam, engineering and a building permit.
Measure how you use the room today. Note where you set down groceries, where two people collide and which corner cabinet swallows things. Our Lynnwood kitchen kept its L-shaped footprint and gained a pantry tower, a corner lazy susan and pull-outs, all laid out in drawings before the order. The common layout errors are in Kitchen Remodel Mistakes: Dos and Don'ts.
Which comes first in a kitchen remodel, cabinets or counters?
Cabinets. They are usually the largest single line in the price, per our pricing guide, and they set the counter, backsplash and appliance openings. Counters are measured after the cabinets are set, so the stone fits the boxes that were actually installed.
Pick the cabinet grade early. Custom and inset cabinets cost more and add 8 to 12 weeks of lead time, per the same guide. Then choose the counter stone, the backsplash tile and the floor as one set. Decide whether the floor runs under the cabinets or into the next room, because that changes the order of work.
Where do appliances fit on the kitchen remodel checklist?
Before the cabinets are ordered. The cabinet openings, the hood, the outlets and the gas line are all sized to the models you pick. Appliance purchase and installation are not included in our kitchen prices. We prepare the electrical, plumbing, gas and venting connections so they are ready to install. How to pick each one, from fuel to the hood, is in 6 Tips on Choosing Appliances for Your Kitchen Renovation.
What lighting and electrical work goes on the checklist?
Plan the lighting: ceiling light for the room, under cabinet light for the counters and any light over an island or sink. Our refresh, small and medium Basic tiers include recessed and under cabinet lighting. The small and medium Mid-Range tiers add a lighting plan, and the refresh Luxury tier adds dimmers.
Then count the circuits. Induction cooktops, pro ranges and more circuits can need a larger electrical panel, per our pricing guide. A larger panel raises the cost, so find out before you commit to the range. Old wiring found at demolition is priced in writing before it is fixed.
What plumbing and gas work does a kitchen remodel need?
At minimum: the sink, faucet, disposal and dishwasher connections. More if the sink, range or gas line moves. In Seattle, plumbing and gas piping permits come from Public Health, Seattle and King County, separate from the building permit (Plumbing and gas piping applications and permits, read October 2026). Other King County cities, except Clyde Hill, issue their own.
Choose the sink and faucet before the counter is cut. Our Lynnwood kitchen, completed early 2024 for about $50,000, set a ceramic farmhouse sink and gold faucet under the garden window.

Which permits go on the kitchen remodel checklist in Seattle?
Usually, once anything behind the walls changes. The 2021 Seattle Residential Code exempts "installing kitchen cabinets, paneling or other surface finishes over existing wall and ceiling systems" from a building permit, "provided no changes are made to the building envelope" (R105.2 item 2, Chapter 1 PDF, page 7, read October 2026). Item 1 exempts minor repairs or alterations of $6,000 or less in any six month period, but they "shall not include the removal, reduction, alteration or relocation of any loadbearing support". R105.3 adds that separate plumbing, electrical and mechanical permits may still be required.
So new cabinets on the same walls can skip the building permit when the building envelope does not change. Moving a loadbearing wall needs a building permit. A moved pipe, gas line or circuit can need its own plumbing or electrical permit under R105.3. City by city answers are in Do You Need a Permit to Remodel a Kitchen?
When do you set the kitchen remodel schedule and start date?
Design, selections and permits come first, then the on-site weeks. Our pricing guide lists 2 to 5 weeks on site for a refresh, 6 to 10 for a small kitchen, 8 to 12 for a medium one and 10 to 16 for a large open kitchen. Custom cabinets add their own 8 to 12 week lead time.
Our Burien white shaker kitchen and laundry ran about 10 weeks, from April 11 to June 22, 2022. Its design drawings were approved before demolition. Set the start date only after every selection is ordered. Our pricing guide names finalizing selections before demolition as one of three ways to keep the cost down.
How do you live without a kitchen during the remodel?
Set up a temporary kitchen in another room before demolition: the refrigerator, a microwave, a kettle or coffee maker, and a plug-in cooktop if you cook. Wash dishes in a laundry or bathroom sink, or plan on paper plates. Plan meals for the on-site weeks in your schedule.
Empty every cabinet and drawer before demolition. Keep a clear path from the door to the kitchen for the crew, and ask where the dust walls go. In our Renton condo, the appliances went back into their places on the new floor at the end.
We build kitchens across King and Snohomish counties, including Home Remodeling Contractors in Lynnwood, WA. The full service is on Kitchen Remodeling Across the Greater Seattle Area.
Frequently Asked Questions
Are permit fees included in a kitchen remodel price?
Not in our starting prices. Permit fees, appliance purchase and installation, and rot, water damage or old wiring found at demolition are priced separately in writing, per our kitchen pricing guide.
Can I keep my cabinets and still remodel the kitchen?
Yes, as a refresh. New doors and drawer fronts on the existing boxes come in at the $50,000+ Mid-Range refresh tier, per our kitchen pricing guide. See Should You Reface or Replace Cabinets When Remodeling a Kitchen?
Will I see the kitchen design before work starts?
Yes. Our designer lays out the kitchen with you and shows it in 3D before you approve it, and the price is written line by line. See Kitchen Remodeling Across the Greater Seattle Area.
What warranty comes with a kitchen remodel?
Every kitchen we build carries a 2-year workmanship warranty, extendable to 5 years. Materials carry their manufacturer's warranty.